Term
Purpose
Definition

A. Provide OSP to both units auxiliaries for normal operations.

 

B. Provide OSP to each protection and safety systems during abnormal and accident conditions

Term
Design Basis
Definition

Operability of the AC and DC Power sources and associated distribution systems during operation ensures sufficient power supplying safety related equipment required for:

1. Safe Shutdown

2. mitigation and control of accident conditions

Term
SPT Cooling Summary
Definition

All SPT have radiators, cooling fans and oil pumps.

 

They are arranged in cooling groups

 

They have Manual/Auto operation

Auto: first group @ 70 second @85 winding temp

Manual: All cooling groups run continuously

Term
Name the 13 KV north ring bs breakers and their normal alignments.
Definition

1-2 NC, 3-4 NC, 4-5 NC, 1-6 NC

5-6 NO, 2-3 NO

Term
For the 5-6 or the 2-3 cross tie breakers to close what interlocks must be satisfied?
Definition

5-6: either the 1-6 or 4-5 must be open

 

2-3: either the 1-2 or 3-4 must be open

Term
Which SPT's feed the 13KV north ring bus and what are their feed breakers?
Definition

#1 and #2 SPT feed the 13KV ring bus

 

#1 SPT feeds the 1-6 and the 1-2

Which feeds the 11SPT and the 21SPT

 Group Buses

#2 SPT feeds the 4-5 and the 3-4

Which Feeds the 12SPT and the 22SPT

Group Buses

Term
Which SPT's feed the 13KV South Ring bus and what breakers do they feed?
Definition

#3 SPT and #4 SPT

 

#3 SPT feed Breakers A-F (13SPT) and

A-B (24 SPT) Vital Buses

#4 SPT feed Breakers C-D (14SPT) and

D-E (23SPT) Vital Buses

Term
What type of breaker is used in the 13KV Ring Bus? What are some of its characteristics?
Definition

13KV GE Magnablast Breaker

Similar to the 4KV version the closing springs charge upon 125 VDC Control power application and upon breaker closing.

A lack of spring charge will be alarmed in the MCR

Term
What type of breaker feeds the 13KV South Bus and what are some of it characteristics?
Definition

13 KV Siemens SF6 style Breakers

Provide Auto and Manual SPT/Section Isolation

Local clear tube style Position indicator on the side of the cabinet

Term
SER 11-90
Definition

Static electrification causes damage to MPT:

 

High oil flow rates of cold oil can build up Static Charge. This could ignite the oil within the Transformer and create a Fire

Supporting users have an ad free experience!