Term
What is the most important concept a Sensor mgr needs to master? |
|
Definition
|
|
Term
Who typically determines revisit rate for a GRCA? |
|
Definition
The Army typically stipulates the revisit rate (7) |
|
|
Term
|
Definition
The requirement of the radar to revisit all approved RSRs within a specified time(7) |
|
|
Term
Define timeline objective |
|
Definition
Current RSRs must be serviced by their specified revisit time(7) |
|
|
Term
What effect does a single shot RSR's impact on the timeline? |
|
Definition
The offset the timeline by their service times (8,19) |
|
|
Term
Changes to TD 404 are ___ and do/ do not affect previously approved RSRs. |
|
Definition
global and immediate, do not(21) |
|
|
Term
Submitted RSRs using other than the parameters set in TD 404 will do what to the timeline? |
|
Definition
It redefines the timeline (21) |
|
|
Term
The _____ console assignment provides the means for the operator to effectively manage the radar timeline |
|
Definition
|
|
Term
In regards to RSR status, what do the following terms mean? 1. Approved 2. Current 3. Active 4. Suspended 5. Complete |
|
Definition
1. Approved - RSR has been approved 2. Current - w/n the rdr field of view 3. Active - RSR is being serviced (shot) 4. Suspended - SAR/FTI suspended from being serviced by radar 5. Complete - RSR has been shot |
|
|
Term
What happens to timeline use as the number of RSRs increase? |
|
Definition
|
|
Term
What does it mean when a timeline is busted? |
|
Definition
The GRCA revisit exceeds the requirement established by the army or our primary customer |
|
|
Term
What should the revisit rate for a GRCA be? |
|
Definition
|
|
Term
In order to minimize the TL at CAP alert, what two things should the SAWO do? What does this do to the alerts? |
|
Definition
Set "0" as the revisit rate for the GRCA and 999 in the threshold field of the RSR FCTN PARAM TD (9)/ renders the alert meaningless |
|
|
Term
The ____ determines which RSR receives priority for radar service. What range is it selectable from? |
|
Definition
IP (interrupt priority), 1-16 (11) |
|
|
Term
The _____ specifies the minimum time that a RSR is scheduled for service by the radar |
|
Definition
|
|
Term
Revisit rates are selectable from _____ to ____, in ____ increments |
|
Definition
|
|
Term
T/F Interrupt priority and revisit rates can be set globally in TD 404, however, the individual RSR setting can override the TD 404 setting |
|
Definition
|
|
Term
Perf levels are selectable from ____. what is the default? |
|
Definition
|
|
Term
Increasing the perf level allows for an increased _______. What is a consequence? |
|
Definition
Probability of detection (12), timeline use increases |
|
|
Term
What happens to the timeline when tgt classification is enabled? |
|
Definition
|
|
Term
What are the interrupt priorities for the following RSRs? 1. AC 2. AP 3. SS 4. WAS 5. SAR 6. FTI 7. SATC |
|
Definition
1. AC - 4 2. AP - 6 3. SS - 8 4. WAS - 10 5. SAR -2 6. FTI -2 7. SATC -4 |
|
|
Term
What are the revisit rates for the following? 1. AC 2. AP 3. SS 4. WAS 5. SAR 6. FTI 7. SATC |
|
Definition
1. AC - 12 2. AP -21 3. SS -30 4. WAS - 0 5. SAR - 6. FTI - 7. SATC - |
|
|
Term
RSRs move from the ___ to the ___ when they are approved. When they are complete, they move to the ____ |
|
Definition
RSR que-Approved RSR list, sar/single scan list td |
|
|
Term
The "D" in the RSR que stands for ____ |
|
Definition
|
|
Term
What is the main defense against an unmanagble timeline? |
|
Definition
|
|
Term
The APPV RSR list t/d is accessible through: |
|
Definition
The radar mgmt menu bar and the proc rsr pushbutton on the MSN common select (31) |
|
|
Term
What does FAC NUM (APPV RSR list) mean? |
|
Definition
Facility number of the platform generating station; cgs or jtids platform (37) |
|
|
Term
In regards to dual side ops, the _______ option is required for max effectiveness |
|
Definition
|
|
Term
What are the min and max time defaults for time on side (dual side ctrl 402) |
|
Definition
|
|
Term
In dual side ctrl, what is the worst place to set the pri side ref pt? Best place? |
|
Definition
In front of the nose/ off boresight (43) |
|
|
Term
The Curr column (dual side ctrl 402) displays _____. |
|
Definition
time in secs that has elapsed since the radar began servicing RSRs on the current side and operates like a counter (45) |
|
|
Term
(dual side ctrl 402) when will the DSS begin to evaluate switching to the opposite side |
|
Definition
When the display in the curr column has surpassed the min time on side value (45) |
|
|
Term
(dual side ctrl 402) The dss will switch sides for what two conditions? |
|
Definition
1. All the rsrs have been serviced at least once since servicing began on that side 2. When the value in the Curr column exceeds the max time on side value (45) |
|
|
Term
The ______ provides the means to APPROVE or disapprove rsrs |
|
Definition
|
|
Term
T/F- the approved rsr list td 2 enables deleting an approved job without going back to the RSR que |
|
Definition
|
|
Term
The _____ allows for global rsr adaptation parameter modifications |
|
Definition
RSR functional parameters TD 404 (4) |
|
|
Term
What are the TD numbers for the following td names: 1. RSR que 2. RSR list 3. RSR Functional parameters 4. Dual side ctrl |
|
Definition
1. RSR que- 401 2. RSR list- TD2 3. RSR Functional parameters- 404 4. Dual side ctrl- 402 5. |
|
|
Term
T/F the radar will process any portion of an AP or AC but a GRCA must be completely in the field of view |
|
Definition
F, AP/AC must be completely be in radar field of view (5) |
|
|
Term
T/F effectinve timieline mgmt is critical for mission operations |
|
Definition
|
|
Term
What happens when radar updates become infrequent? |
|
Definition
Possibly renders the info useless (6) |
|
|
Term
The % timeline alert threshold is selectable through the ______ |
|
Definition
RSR functional parameters TD 404 (9) |
|
|
Term
Which TD can be used to set non-global parameters for RSRs? |
|
Definition
|
|
Term
What three things will vary the service time for target classification? |
|
Definition
RSR size, resolution and quantitity (13) |
|
|
Term
Target classification, when enabled will ______ RSR service times. This change in service time is used to determine the difference between _____ |
|
Definition
increase; tracked and wheeled (13) |
|
|
Term
T/F smaller RSRs will take less time to service than large rsrs. |
|
Definition
|
|
Term
Changes to the parameters in the RSR functional parameters td (404) are ________ in nature. |
|
Definition
global and immediate (17) |
|
|
Term
On the functional parameters TD 404, the ____ tab defines initial timeline objective for the system |
|
Definition
|
|
Term
Changes in TD 404 pertaining to (3 things) are very important for effective timeline mgmt. |
|
Definition
Revisit interval, perf level, tgt classification (21) |
|
|
Term
What column in the approved rsr list td 404 will allow one to ensure revisits are w/n standards? |
|
Definition
RI- Revisit interval (35) |
|
|
Term
What does the SRM do? What percentage of the timeline is it allocated? |
|
Definition
Controls sensor resources for the maintenance of priority tracks; 20% (51) |
|
|