Shared Flashcard Set

Details

Alternate Shutdown System (ASDS)
BWR Systems
5
Other
Not Applicable
07/27/2012

Additional Other Flashcards

 


 

Cards

Term
ASDS

Describe the design basis of ASDS.
Definition
-Satisfy safe shutdown requirements.
-Cladding temp limited to < 1500F.
-Primary pressure < 1332# steam dome pressure.
-Primary containment pressure < 62#.
-Primary containment temperature low enough for NPSF for Torus as a water source.
Term
ASDS

Describe RPS w/ASDS.
Definition
-RPS is not part of ASDS.
-Can insert control rods at ASDS by depressurizing the SCRAM air header.
Term
ASDS

Describe coolant inventory control with ASDS.
Definition
-Manual operation of SRVs (E,F,G,H).
-Manual operation of 12 core spray pump.
Term
ASDS

Describe decay heat removal from ASDS.
Definition
-All supplied from TORUS.
-Torus is suction supply for core spray.
-Torus is where SRVs discharge to.
-Torus cooled in Torus cooling mode.
Term
ASDS

Describe transfer of power to ASDS.
Definition
-Master switch supplies power to ASDS panel.
-Must use seperate power switch on ASDS panel for each system (SRVs, 12EDG, MSIV outboards, CS, and RHR).
-All interlocks and manual operation from control room are blocked.
Supporting users have an ad free experience!