Shared Flashcard Set

Details

ATLAS B777 Electrical
Electrical
16
Aviation
Professional
05/25/2022

Additional Aviation Flashcards

 


 

Cards

Term
Which Bus does the APU automatically connect to when started on the ground?
Definition

If Primary External power is on the right AC bus or the Primary is on the right and secondary external on the left busses, or Primary on both busses-Left Main AC Bus

(Primary will then power the right AC bus)

If Secondary external power is on both busses-Both AC Buses

If no buses are powered-Both Main AC Busses

 

(FCOM Vol 2, Rev 2- 6.20.2)

Term
When do the the backup generators come online?
Definition

The backup electrical system automatically powers one or both transfer busses when-only one main AC Generator (includes APU) is available power to one or both of the main AC busses is lost approach (APP) mode is selected for autoland(think GMA)

 

(FCOM Vol 2, Rev 2- 6.20.7)

Term
What causes the Integrated Drive Generator to disconnect automatically?
Definition

High Drive oil temperature

 

(FCOM Vol 2, Rev 2- 6.20.2)

Term
What is the priority sequence for powering the main AC bus (controlled via the bus ties)?
Definition

Respective IDG APU generator opposite engine driven generator

(ground power must be selected manually)

 

(FCOM Vol 2, Rev 2- 6.20.5)

Term
What does the RAT shed first when airspeed slows?
Definition

Electrical loads before hydraulic.

 

(FCOM Vol 2, Rev 2- 6.20.14)

Term
With the RAT as the only source of power, other than batteries, what is powered?
Definition

The C1 and C2 TRU's which power

Both Captain's flight instrument bus

First Officer's flight instrument bus Center flight control PSA

 

(FCOM Vol 2 Rev 2- 6.20.9)

Term
With only the battery for standby power, what is powered?
Definition

Left and Center flight control Power Supply Assemblies (PSA's)

Hot Battery Bus

Standby inverter

Battery Bus

Captain's flight instrument Bus

(think LCP HSBC)

 

(FCOM Vol 2, Rev 2- 6.20.13-14)

Term
How is the Ground Handling Bus powered?
Definition

The Ground Handling Bus can be powered by the primary external power or the APU Generator [external has priority].

 

(FCOM Vol 2, Rev 2- 6.20.5)

(citation needed for brackets)

Term
What does the Ground Handling Bus power?
Definition

Cargo handling

Fueling/defueling operations

other equipment (?)

Energized only during ground operations

 

(FCOM Vol 2, Rev 2- 6.20.5)

Term
Why should we know the ground service bus exists?
Definition

It powers the Main and APU battery chargers.

 

(FCOM Vol 2, Rev 2- 6.20.5)

Term
What is the ground service bus normal and alternate source of power?
Definition

Normal

Right Main AC Bus

 

Alternate

APU

External Power

 

(FCOM Vol 2, Rev 2- 6.20.5)

Term
What is the AC Bus source priority sequence for powering the left and right main buses?
Definition

Respective IDG

APU generator

Opposite IDG

(external must be selected manually)

 

(FCOM Vol 2, Rev 2- 6.20.5)

Term
How many frequency converters are there to make sure backup generator frequency and voltage are correct?
Definition

One

 

(FCOM Vol 2, Rev 2- 6.20.7)

Term
How many backup generators can be on line at once?
Definition

One....because there is only one frequency converter available to make sure backup generator frequency and voltage are correct

 

(FCOM Vol 2, Rev 2- 6.20.7)

Term
Can one backup generator power both transfer busses?
Definition

Yes

 

(FCOM Vol 2, ???Rev 2)

Term
What happens when low oil pressure is detected in an IDG?
Definition

The DRIVE light illuminates

EICAS message ELEC GEN DRIVE L or R

 

(FCOM Vol 2- 6.20.2)

Supporting users have an ad free experience!