C.4-K (Immediate Reactor Shutdown) Immediate Actions
Definition
  1. If time permits, then reduce recirc flow to minimum
  2. Initiate Manual Reactor Scram, then enter C.4-A
  3. Notify Shift Supervision.
Term
C.4-A (Reactor Scram) Immediate Actions
Definition
  1. Place REACTOR MODE switch in SHUTDOWN
  2. Determine if all control rods are inserted to or beyond position 04
  3. Notify Shift Supervision.
Term
C.4-F (Rapid Power Reduction) Immediate Actions
Definition
  1. Reduce recirc flow but do not go below 35 Mlb/hr
  2. IF core flow is less than 35 Mlb/hr, THEN execute C.4-B.05.01.02.A (Control of Neutron Flux Oscillations) concurrently
  3. IF conditions require initiation of manual scram THEN execute C.4.K (Immediate Reactor Shutdown)
  4. Notify Shift Supervision.

NOTE: Reducing power with rods is NOT an immediate action. It is a subsequent action and requires the procedure to be out.

Term
C.4-B.02.05.A (Loss of RBCCW Flow) Immediate Actions
Definition
  1. Verify a RBCCW pump is running
  2. If RBCCW System pressure cannot be restored WITHIN 60 seconds, then perform the following:
    1. TRIP the RECIRC PUMPS and execute C.4-B.01.04.B (Trip of Two Recirc Pumps)
    2. CLOSE RBCCW drywell isolation valves MO-1426, MO-4229, and MO-4230
  3. Notify Shift Supervision
Term
C.4-B.02.05.B (Leak Into RBCCW) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.02.01.A (Loss of Fuel Pool Cooling) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.02.04.A (Steam Leaks Outside Primary Containment) Immediate Actions
Definition
  1. Evacuate personnel from affected area (use plant page announcement)
  2. Notify Shift Supervision.
Term
C.4-B.03.03.B (Relief Valve Leaking) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.03.03.A (Stuck Open Relief Valve) Immediate Actions
Definition
  1. If an SRV indicates OPEN, THEN place switch for the affected SRV at Panel C-03 to OPEN and return to normal position;
  2. IF SRV E, G, or H OPEN, THEN perform the following:
    1. Place respective switch… at Panel C-03 in CLOSE
    2. Place Div II Lo-Lo Set Logic switch (HS-S3B) at Control Room Panel C-253D in BYPASS
  3. Notify Shift Supervision.
Term
C.4-B.01.04.A (Trip of One Recirc Pump) Immediate Actions
Definition
  1. Execute C.4-B.05.01.02.A (Control of Neutron Flux Oscillations) concurrently
  2. Notify Shift Supervision.
Term
C.4-B.01.04.B (Trip of Two Recirc Pump) Immediate Actions
Definition
  1. Execute C.4-B.05.01.02.A (Control of Neutron Flux Oscillations) concurrently
  2. Notify Shift Supervision.
Term
C.4-B.01.03.A (Loss of CRD Pump Flow) Immediate Actions
Definition
  1. Verify a CRD pump is running
  2. Notify Shift Supervision.
Term
C.4-B.03.04.A (Loss of Normal Shutdown Cooling) Immediate Actions
Definition
Notify Shift Supervision of plant conditions.
Term
C.4-B.04.01.A (Primary Containment Isolation - Group 1) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.04.01.B (Primary Containment Isolation - Group 2) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.04.01.C (Primary Containment Isolation - Group 3) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.04.01.D (Primary Containment Isolation - Group 4) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.04.01.E (Primary Containment Isolation - Group 5) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.05.01.02.A (Control of Neutron Flux Oscillations) Immediate Actions
Definition

GENERAL NOTE 1: To determine core flow with only one Recirc pump running, idle loop jet pump flow must be subtracted from the running loop jet pump flow.

GENERAL NOTE 2: During core flow transients, it may take up to two minutes for indicated flow to match actual flow.

 

IMMEDIATE OPERATOR ACTIONS

  1. IF core flow is LESS THAN 35 Mlbm/hr,
    THEN determine if the stability BUFFER or EXCLUSION regions have been entered.
     
  2. IF neutron flux oscillations are observed for any reason while operating in the stability
    BUFFER or EXCLUSION regions,
    THEN initiate a MANUAL REACTOR SCRAM.
     
  3. Notify Shift Supervision.
Term
C.4-B.04.01.G (ECCS Suction Control During LOCA) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.04.01.F (Leak Inside Primary Containment) Immediate Actions
Definition
Notify Shift Supervision
Term
C.4-B.05.14.A (Earthquake) Immediate Operator Actions
Definition
Notify Shift Supervision
Term
C.4-B.05.13.A (Loss of Annunciator) Immediate Operator Actions
Definition
Notify Shift Supervision
Term
C.4-B.05.07.A (Loss of Reactor Water Level Control) Immediate Operator Actions
Definition
  1. Control Reactor level in MANUAL using any unlocked FW REG valve M/A station
  2. Notify shift supervision
Term
C.4-B.05.09.A (Main Steam Pressure Regulator Failure Causing Reduction in Main Steamline Pressure) Immediate Operator Actions
Definition
Notify Shift Supervision
Term
C.4-B.05.09.B (Main Steam Pressure Regulator Failure Causing Increased Pressure) Immediate Operator Actions
Definition
Notify Shift Supervision
Term
C.4-B.06.02.04.A (Stator Cooling Water Failure) Immediate Operator Actions
Definition
  1. Verify a Stator Cooling water pump is running
  2. IF a total loss of Stator Cooling has occurred AND cooling cannot be immediately restored, THEN initiate a Reactor Scram
  3. Notify Shift Supervision
Term
C.4-B.06.03.A ([Degrading] Condenser Vacuum) Immediate Operator Actions
Definition
  1. Reduce reactor power per C.4-F to stablize condenser vacuum
  2. Notify shift supervision.
Term
C.4-B.06.03.B (Condenser Tube Leak) Immediate Operator Actions
Definition
Notify Shift Supervision
Term
C.4-B.06.04.A ([Reduction] in Circ Water Flow) Immediate Operator Actions
Definition
Notify Shift Supervision