Term
When is the engine generator tripped? |
|
Definition
Over/Under voltage Over/Under frequency Over current |
|
|
Term
What does the green "AVAIL" light on external power indicate? |
|
Definition
External power is available and within limits |
|
|
Term
What is the bus priority for AC bus 1 and 2? |
|
Definition
On-side gen APU gen Cross-side gen External AC |
|
|
Term
What does the "AUTO XFER FAIL" light on electrical panel mean? |
|
Definition
Auto bus transfer inhibited due to bus fault or generator over-current |
|
|
Term
Where does the the AC ESS BUS receiver power? |
|
Definition
|
|
Term
When are the AC utility buses load shed? |
|
Definition
Single engine ops in flight Single gen or ext AC only with flaps down on ground Manually by AC/DC utility |
|
|
Term
ADG - What is the power output? What does it power? |
|
Definition
115v, 400hz, 15kva AC ESS BUS and 3B HYD pump |
|
|
Term
When does the ADG auto-deploy? |
|
Definition
Both AC bus 1 and AC bus 2 become unpowered in flight |
|
|
Term
How is power obtained if the ADG fails? |
|
Definition
DC ESS BUS through BATT BUS through the Emergency DC Xfer Contactor by operating the ADG manual handle |
|
|
Term
How long does battery power last? |
|
Definition
|
|
Term
Why pull the ADG handle before landing? |
|
Definition
BATT BUS powers DC ESS BUS when ADG slows down Allows thrust reversers to be stowed |
|
|
Term
How are the batteries charged? |
|
Definition
Main - AC bus 1 APU - AC bus 2 |
|
|
Term
What does the Auto Xfer "OFF" light mean? |
|
Definition
Auto bus tie has been manually disabled |
|
|
Term
What does pulling the ADG handle do? |
|
Definition
Releases ADG Energizes emergency AC/DC Xfer contactors Energizes HYD 3B Xfer contactor |
|
|
Term
"EMER POWER ONLY" warning |
|
Definition
ADG is supplying ESS bus AC bus 1 and 2 are not powered |
|
|
Term
Where do DC BUS 1 and 2 receive power? |
|
Definition
DC BUS 1 - TRU 1 then TRU 2 DC BUS 2 - TRU 2 then TRU 1 |
|
|
Term
Where does the DC ESS BUS receive power? |
|
Definition
ESS TRU 1 and 2 APU BATT BUS Batteries (through Emer DC Transfer Contactor) |
|
|
Term
Where does the DC EMER BUS receive power? |
|
Definition
APU BATT DIR BUS and BATT BUS |
|
|
Term
Where does the BATT BUS receive power? |
|
Definition
ESS TRU 1 and 2 APU BATT DIR and MAIN BATT DIR BUSes |
|
|
Term
Where do DC UTIL BUS 1 and 2 receive power? |
|
Definition
DC UTIL BUS 1 - TRU 1 DC UTIL BUS 2 - TRU 2 |
|
|
Term
How is AC power provided during an in-flight emergency? |
|
Definition
|
|
Term
How many AC power sources are available? |
|
Definition
5
Left & right engines APU ADG External power |
|
|
Term
|
Definition
|
|
Term
Which circuit breaker panels contain the AC and DC ESS BUSes? |
|
Definition
CBP3 - AC ESS CBP4 - DC ESS |
|
|
Term
How many DC power sources are available? |
|
Definition
TRUs Main battery APU battery External DC |
|
|
Term
What is the purpose of the Main Bus Tie switch? |
|
Definition
Allows both DC buses to be powered by a single TRU |
|
|
Term
Can the ADG Unit be tested in the air? |
|
Definition
Yes, takes 5.7 seconds for the light |
|
|