Term
When is the TD and EMD formulized? |
|
Definition
Milestone A: Technology Development |
|
|
Term
The PM must demostrate ______ ______ in FYDP at what milestone? |
|
Definition
Full Funding (at least 6 years of funding)
Milestone B |
|
|
Term
For Milestone ___, who approves the following:
Program Initiation
Entry into EMD
Acq. Strategy
Acq. Program Baseline
LRIP Qtys
Type of Contract
Milestone Certification
ADM |
|
Definition
|
|
Term
At the beginning of Milestone B, (Integrated System Design) what occurs? |
|
Definition
Mature technology
Approved requirements
Full Funding in FYDP |
|
|
Term
At the beginning of Milestone B, (System Capability and Manufacturing Process Demostration) what occurs? |
|
Definition
Post CDR Assessment
Establishment of initial product baseline |
|
|
Term
Exit Criteria for MS B (Integrated System Design) |
|
Definition
Complete System Level CDR
Post CDR Assessments by MDA |
|
|
Term
Exit Criteria MS B for System Capability and Manufacturing Process Demonstration |
|
Definition
System demonstrated in intended environment using production representative articles
Manufacturing processes demonstrated
Meets exit criteria and MS C Entrance Critiera |
|
|
Term
What is the max LRIP QTY allowed? |
|
Definition
|
|
Term
The _________ _________ and the _____ for the Production and Deployment phase shall be submitted for ____ review and approval prior to MS __ and in sufficient time for the source selection to be completed prior to the milestone event. |
|
Definition
Acquisition Strategy (AS)
RFP
MS C |
|
|
Term
What is the Milestone?
Updated AS and APB
Entry into LRIP, if LRIP is needed
Exit criteria for LRIP, if appropriate
ADM |
|
Definition
Milestone C and the MDA approves |
|
|
Term
Actys during this effort include:
FRP
Fielding and support of fielded systems
IOC/FOC |
|
Definition
|
|
Term
Entry criteria:
DT & OA acceptance
mature s/w
no signifcant manfacturing risks
approved CPD
refined integrated architecture
aceptable interoperability and operational supportabilty
demonstration of affordabilty
fully funded
phased for rapid deployment |
|
Definition
Production and Deployment |
|
|
Term
Who approves Full Rate Production Review?
|
|
Definition
|
|
Term
-Identifies capability needs and gaps
-Recommends non-materiel or materiel approaches
-Becomes the basis for validating capabilty needs
-Results in the potential development and deployment of new or improved capabilties |
|
Definition
CBA: Capabilities Based Assessment |
|
|
Term
-Captures the results of the CBA (Capabilities Based Assessment)
-Defines capability gaps in the terms of:
-functional area
-relevant range of military ops
-timeline under consideration
Can be developed by the joint warfighter, the joint staff, or other functional agencies or sponsors
Supports the MDD, the AOA, the TDS, MSA, and the next Milestone Decision
|
|
Definition
ICD: Initial Capabilties Document (ICD) |
|
|
Term
Identifies system specific Performance Parmaters
-identifies the thresholds and objectives
Applies to a single increment of the program's development
Prepared during the Technology Development Phase for use at Milestone B |
|
Definition
Capability Development Document (CDD) |
|
|
Term
What document is published by the user, builds on the ICD and captures the information necessary to develop a proposed program? |
|
Definition
|
|
Term
Prepared during the EMD phase to guide the Production and Deployment Phase
-Supports MS C decision and must be validated and approved prior to MS C
Identifies production attributes for a single increment of a program
Rewritten for each increment in an evolutionary acq. program
KPPs, performance attributes, and cost and engineering estimates are refined in the CPD |
|
Definition
Capability Production Document (CPD) |
|
|
Term
When is the CPD validated and approved before what MS? |
|
Definition
|
|
Term
|
Definition
Doctrine
Organization
Training
Materiel
Leadership and Education
Personnel
Facilities |
|
|
Term
Certification required by 10 USC 2366: Technology demonstrated in a relevant environment. What TRL corresponds to the above?
Who determines? |
|
Definition
6-System/Subsystem model or prototype demonstration in a relevant environment
DDR&E |
|
|
Term
What are the Five Net-Ready KPPs? |
|
Definition
1. Compliant Solution Architecture - The Blueprints
2. Compliant with net-centric data and service strategies - Brick & Motar
3. Compliant with applicable GIG (Global Interface Grid) - Building Codes
4. Compliant with DoD information Assurance - Building Inspector
5. Compliant with supportability requirements to include spectrum utilization and information bandwidth requirements - Utilities |
|
|
Term
What is Modeling & Simulation (M&S)? |
|
Definition
Used to demonstrate systems integration and risk
Support live testing with Modeling & Simulation stresses
Assist in planning in scope of live test and data analysis |
|
|
Term
The most liberal rights that can be given to the government. This category permits the government to use the data and software delivered under a contract without any restrictions whatsoever. Included is the right to distribute the data and software to competitors for re-procurement purposes |
|
Definition
|
|
Term
Apply only to technical data and not to computer software, represent the greatest degree of protection the contractor can obtain for technical data delivered to the government under a contract |
|
Definition
|
|
Term
|
Definition
Are analogous to limited rights in technical data but apply only to computer software or computer software documentation, place limits on how the government may use (noncommercial) computer software. |
|
|
Term
Government Purpose Rights |
|
Definition
Applicable to all mixed-funding situations, allows the government to use technical data and/or computer software for government purposes only including competition but excluding commercial use. |
|
|
Term
The three key factors in determining which type of data rights the government acquires are |
|
Definition
-The Source of funding -Whether the item has actually been “developed.” -Government Needs |
|
|
Term
Who determines demo in “relevant” environment |
|
Definition
|
|
Term
Technology demonstrated in relevant environment |
|
Definition
Certification Required by 10 USC 2366 |
|
|
Term
Congressional oversight committees must be notified, in _______, prior to initiation of _____new start program. |
|
Definition
|
|
Term
Prior Approval Reprogramming must be submitted to establish a new RDT&E program, project or subproject estimated to cost $10M or more within the first 3 years. |
|
Definition
|
|
Term
For RDT&E funds, a ________ _______is any program, subprogram, modification, project or subproject not previously justified by the Department of Defense and funded by Congress through the normal budget process.” |
|
Definition
|
|
Term
|
Definition
-Minimum “contents” -System Requirements -Funding -Manpower -Requirements (CDD/CPD) Approval Process Other Program documentation |
|
|
Term
|
Definition
Best practice or policy? No longer required by policy What is it really for – specifies relationships and responsibilities |
|
|
Term
|
Definition
Reasonable to obtain signature at the SAE level for ACAT I |
|
|
Term
|
Definition
Lead service budgets for entire program with the exception of service unique items |
|
|
Term
Modeling & Simulation Role |
|
Definition
-Integrate with T&E program (sub-group) -Used to develop pre-test and test events -Assist in validation of system interoperability -Supplement design qualification, actual T&E, manufacturing and operational support -Data from actual testing supports validation of M&S -Helps in assessment of design threats -Aids in the design process Accreditation ? -Potential to save program $$ OTAs use M&S but program office responsible for development; M&S used even more for DT&E |
|
|
Term
When should corrosion control planning begin? |
|
Definition
as early as possible; consider before MS B |
|
|
Term
Corrosion Prevention Advisory Team |
|
Definition
Prime ... materials, process,& treatments DoD … SME’s to interface with CCT and advise PM |
|
|
Term
|
Definition
· Program Assessment · Resolve Issues Elevated by WIPTs
Independent Assessment · Issue Resolution |
|
|
Term
|
Definition
Identify/Resolve Program Issues
Recommendations for Program Success |
|
|
Term
|
Definition
Manage Complete Scope of Program, Resources & Risk · Integrate Government & Contractor Efforts for Program Success Program Execution |
|
|
Term
Who is in charge of the WIPT? |
|
Definition
|
|
Term
__________ may Co-Chair WIPT meetings as invited |
|
Definition
|
|
Term
|
Definition
-Cost/Performance (desirable) -Requirements and Integration (desirable and justified by program issues) -Sustainability (probably a good idea) -Acquisition Strategy (probably justified) |
|
|
Term
|
Definition
Representation from various service component systems Challenge: integrating and synthesizing program efforts of three previously distinct programs Several structures possible Geographical considerations Service considerations (funding, billets) Organizational considerations (functional, matrix, other) |
|
|
Term
|
Definition
Evolving capability to provide a one-stop, authoritative, configuration managed source of technical compliance guidance |
|
|
Term
DOD IA and Critical Infrastructure Protection (CIP) |
|
Definition
Minimizes system and information vulnerabilities |
|
|
Term
DOD Supportability Requirements |
|
Definition
Complies with Electromagnetic Environmental Effects Control and Spectrum Supportability Policy |
|
|
Term
|
Definition
Must comply with DoD Architecture Framework and Information Enterprise Architecture (IEA) |
|
|
Term
Requires ________ posted on DOD Architecture Registry System (DARS) |
|
Definition
|
|
Term
Net-Centric Data and Services Strategy |
|
Definition
Makes data and services available to GIG users |
|
|