Term
List and briefly describe the following integrated architecture products that should be included as part of the Capability Development Document (CDD):
AV-1 |
|
Definition
Overview and Summary Information, includes the scope, purpose, intended users, environment depicted, analytical findings. |
|
|
Term
List the five key elements comprising the Net-Ready Key Performance Parameter (NR-KPP) and give a brief description of each. |
|
Definition
1. Compliant Solution Architecture The Blueprints (Solution Architecture): Description of the system’s operation, traceable between the views. Defines end-to-end operational effectiveness for the exchange of information .
2. Compliant with net-centric data and services strategies Brick & Mortar (Net Centric Data and Services Strategies): Describes the activities, standards and data strategy required to use, operate maintain and manage the net-centric information environment.
3. Compliant with applicable Global Interface Grid (GIG) technical guidelines Building Codes (Techncial Standards /Interface): Set of managed technical interface standards – ensuring visibility and stability to critical interfaces.
4. Compliant with DoD Information Assurance (IA) requirements Building Inspector (Information Assurance): Defense Assurance Certification and Accreditation Process (DIACAP).
5. Supportability. Utilities. Compliant with supportability requirements to include spectrum utilization and information bandwidth requirements, Selective Availability Anti-Spoofing Module (SAASM) and the Joint Tactical Radio System (JTRS) as applicable. Verify completion of spectrum availability, electromagnetic compatibility, JTRS usage and GPS Selective Availability Anti-Spoofing Module (SAASM) requirements. |
|
|
Term
List and briefly describe the following integrated architecture products that should be included as part of the Capability Development Document (CDD):
AV-2 |
|
Definition
Integrated Dictionary, the architecture data repository with definitions of all terms used in all products. |
|
|
Term
List and briefly describe the following integrated
architecture products that should be included as part of
the Capability Development Document (CDD):
OV-1 |
|
Definition
High-level Operational Concept Graphic, a high-level graphical/textual description of operational concept. |
|
|
Term
List and briefly describe the following integrated
architecture products that should be included as part of
the Capability Development Document (CDD):
SV-2
|
|
Definition
Systems Communications Description/Services Communications Description includes systems nodes, systems, system items, services and service items and their related communications lay-downs. |
|
|
Term
List and briefly describe the following integrated
architecture products that should be included as part of
the Capability Development Document (CDD):
TV-1 |
|
Definition
Technical Standards Profile, provides the listing of standards that apply to Systems and Services View elements in a given architecture. |
|
|
Term
Explain the difference between the various views in the solution architecture, that is, between the "all view," "operational view," "system view," and "technical view.“ |
|
Definition
Operational View (OV): Describes what needs to be done and who does it, and the information exchanges required
Systems and Services View (SV): Flows from the OV; relates systems, services, and characteristics to operational needs
Technical Standards View (TV): Prescribes the standards and conventions
n Ensures that a system satisfies a specified set of operational requirements
n Guidelines upon which engineering specifications are based
n All View (AV): overarching aspects of an architecture that relate to all three views; sets the scope and context of the architecture |
|
|
Term
What takes place prior to the Material Solution Analysis (MSA) and then the acquisition process begins? |
|
Definition
JCIDS: Joint Capabilties Integration Development System |
|
|
Term
What is Evolutionary Acquisition? |
|
Definition
Capabilitiy delivered in increments (not spirals), recognizing up front need for future capability improvments.
Each increment::
-depnds on mature technology
-is a military useful and supportable operational capability
-Successive Technology Development Phases may be needed to mature technology for multiple increments |
|
|
Term
What is the formal entry into the acquisition process? |
|
Definition
MDD: Material Development Decision |
|
|
Term
What happens prior to Mileston A? |
|
Definition
|
|
Term
What comes out of the Materiel Solution Analysis? |
|
Definition
ICD: Initial Capabilties Document |
|
|
Term
As of Feb 2011, who will do the following:
-participate in CDRs
-prepare an assessment of design maturity and technical risks
-coordinate these assessments with the PM prior to forwarding the to the MDA? |
|
Definition
The Office of Deputy Assistant Secretary of Defense (Systems Engineering)
DASD(SE) |
|
|
Term
Is required only if PDR comes after Milestone B and duirng the Engineering and Manufacturing Development (EMD)? |
|
Definition
Post PDR Assessment
Post CDR Assessment |
|
|
Term
What is the formal entry into the acquisition process and is manadatory for all programs? |
|
Definition
MDD: Materiel Development Decision |
|
|
Term
1. Who approves the guidance to conduct the AOA, which determines the phase of entry into the process; an designates a lead component?
2. ACAT I programs who provides? |
|
Definition
1. MDA (Milestone Decision Authority)
2. OSD / PA&E |
|
|
Term
What is the review that authorizes FRP? |
|
Definition
Full Rate Production (FRP) Decision Review |
|
|
Term
What are the FIVE Better Buying Power categories? |
|
Definition
1. Target Affordability and control cost growth.
2. Incentivize productivity and innovation in industry
3. Promote real competition
4. Improve tradecraft in services acquisition
5. Reduce non-productive process and bureaucracy |
|
|
Term
What are the two documents for document streamlining? |
|
Definition
1. PDUSD AT&L memo 20 APRIL 2011 - Document Streamlining Program Strategies and SEP
2. PDUSD AT&L memo 14 SEP 2011 - Document Streamling Lifecycle Sustainment Plan |
|
|
Term
When consistent with technology development phase objectives, associated prototyping activity, an dthe MDA approved TDS, the PM shall plan a ________________________________. |
|
Definition
Preliminary Design Review (PDR) before Milestone B. |
|
|
Term
If a PDR has not been conducted prior to Milestone B, the PM shall plan for a PDR when? |
|
Definition
After Milestone B - as soon as feasible after program initiation. |
|
|
Term
S&T Actys, ATDs, JCTDs, qualified prototype projects, joint warfighting experienments occur during what phase of the acquisition process? |
|
Definition
Pre-System Acquisition: Technology Opportunities
|
|
|
Term
-Determines acquisition phase of entry
-Identifies intial review milestones
-Designates a Lead DOD component
-Approves Acquisition Decision Memorandum (ADM) |
|
Definition
MDA: Milestone Decision Authority
ACAT I programs: OSD, Dir, PA&E |
|
|
Term
What is the exit criteria for a Materiel Development Decision (MDD)? |
|
Definition
-Intial Capabilities Document (ICD)
- Director, CAPE will prepare and approve AOA study guidance
-AOA Plan due immediately following MDD |
|
|
Term
What is the entry criteria into the Materiel Solution Analysis? |
|
Definition
Approved ICD
Study guidance for conducting the AOA |
|
|
Term
What actys occur during the Materiel Solution Analysis (MSA)? |
|
Definition
Conduct AOA
Develop Technology Development Strategy (TDS)
Draft CDD |
|
|
Term
What is the exit criteria for the MSA? |
|
Definition
Materiel solution to capability need in ICD recommended by lead component conducting the AOA, and phase-specific exit criteria have been satisfied. |
|
|
Term
At Milestone A, who approves the following:
-Materiel Solution
-Technology Development Strategy (TDS)
-Exit criteria for next phase
-Milestone A Certification (10 USC 2366a)
-Acquisition Decision Memorandum (ADM) |
|
Definition
MDA: Milestone Decision Authority |
|
|
Term
What is the readiness capability required at what milestone? |
|
Definition
|
|
Term
What acquistion phase?
Begin of the phase: MDA approved materiel solution and TDS, full funding in FYDP and for ACAT I and IA programs: ICE |
|
Definition
|
|
Term
What occurs during the Technolgy Development Phase? |
|
Definition
Competitive Prototyping, Develop Reliablity, Availability, and Maintainabilty (RAM) strategy, conduct PDR |
|
|
Term
Affordable increment of military useful capaiblty identified
Technolgy demonstrated in relevant environment
manufacturing risks identified
PDR
System or increment ready for production within short time frame (less for weapons systems)
Exit Criteria for what Phase? |
|
Definition
|
|
Term
What milestone is the APB approved and certifies the program? |
|
Definition
|
|
Term
“Following the ____________,the MDA may authorize entry into the acquisition management system at any point consistent with phase-specific entrance criteria and statutory requirements.” |
|
Definition
Materiel Development Decision (MDD) |
|
|
Term
Description of the system’s operation, traceable between the views. Defines end-to-end operational effectiveness for the exchange of information |
|
Definition
Compliant Solution Architecture The Blueprints (Solution Architecture): . |
|
|
Term
Describes the activities, standards and data strategy required to use, operate maintain and manage the net-centric information environment. |
|
Definition
Compliant with net-centric data and services strategies Brick & Mortar (Net Centric Data and Services Strategies): |
|
|
Term
Set of managed technical interface standards – ensuring visibility and stability to critical interfaces. |
|
Definition
Compliant with applicable Global Interface Grid (GIG) technical guidelines Building Codes (Techncial Standards /Interface): |
|
|
Term
Compliant with supportability requirements to include spectrum utilization and information bandwidth requirements, Selective Availability Anti-Spoofing Module (SAASM) and the Joint Tactical Radio System (JTRS) as applicable. Verify completion of spectrum availability, electromagnetic compatibility, JTRS usage and GPS Selective Availability Anti-Spoofing Module (SAASM) requirements. |
|
Definition
Supportability. Utilities. |
|
|
Term
Set of managed technical interface standards – ensuring visibility and stability to critical interfaces. |
|
Definition
Compliant with applicable Global Interface Grid (GIG) technical guidelines Building Codes (Techncial Standards /Interface):
|
|
|
Term
Defense Assurance Certification and Accreditation Process (DIACAP). |
|
Definition
Compliant with DoD Information Assurance (IA) requirements Building Inspector (Information Assurance):
|
|
|