Function of HVAC
Definition
Provide appropriate environmental conditions for personnel and plant equipment. Provide controlled flow direction and release of radioactive gases.
Term
Big picture Reactor Building HVAC happenings when SBGT Initiation
Definition
  • Building supply fans trip off;
  • Building exhaust fans trip off;
  • Plenum exhaust fans trip off.
Term
"V-AC-4 power supply, what it cools, what cools it, and where it can be initiated"
Definition
MCC-143; B RHR and Core Spray room; service water (FSW back-up); C-20 and ASDS panel.
Term
"V-AC-5 power supply, what it cools, what cools it, and where it can be initiated"
Definition
MCC-133; A RHR and Core Spray room; service water (FSW back-up); C-20
Term
"V-AC-6 power supply, what it cools, what cools it, and where it can be initiated"
Definition
MCC-143; RCIC room; Service water only; C-20
Term
"V-AC-7A power supply, what it cools, what cools it, and where it can be initiated"
Definition
"MCC-133; CRD pump area; service water; in AUTO, will start at 85 degrees F"
Term
"V-AC-7B power supply, what it cools, what cools it, and where it can be initiated"
Definition
"MCC-143; CRD pump area; service water; in AUTO, will start at 90 degrees F"
Term
"V-AC-8A power supply, what it cools, what cools it, and where it can be initiated"
Definition
"MCC-133; HPCI room; service water (FSW back-up); in AUTO, will start at 85 degrees F."
Term
"V-AC-8B power supply, what it cools, what cools it, and where it can be initiated"
Definition
"MCC-143; HPCI area; service water (FSW back-up); in AUTO, will start at 90 degrees F; NOTE: currently isolated as part of ESW load calculation. Fan will not start so as to not add heat to room."
Term
"V-AC-10A/B job title, interlock?, auto isolate on SBGT?"
Definition
Reactor Building Main supply fans; will not start unless V-EF-24A or V-EF-24B is running with flow established. Auto S/D on SBGT initiation.
Term
"V-EF-24A/B job title, interlock?, auto isolate on SBGT?"
Definition
Reactor Building Main exhaust fans; Main supply fans will not start unless one exhaust fan is running with flow established.
Term
"V-AH-4A/B job title, interlock?, auto isolate on SBGT?"
Definition
Refuel Floor Supply fans; Neither fan will start unless V-EF-28 is running with flow established; Auto S/D on SBGT initiation.
Term
"V-EF-28 job title, interlock?, auto isolate on SBGT?"
Definition
"Refuel Floor Exhaust fan (located in Plenum… draws from Fuel pool, dryer/separator pit, and/or vessel cavity); supply fans (V-AH-4A/B) will not run unless this fan is running and has developed flow. Auto S/D on SBGT initiation."
Term
"V-SF-3 and V-SF-4 job title, interlock?, auto isolate on SBGT?"
Definition
"Recirc MG set supply fans; With fan in AUTO, will start when either MG set is started (alternator swaps which fans start on successive starts); NO auto S/D"
Term
V-FU-5
Definition
"Filters air in RWCU room; no direct S/D signal, but will trip on high duct pressure when SBGT initiates."
Term
V-CC-10
Definition
Cooling to steam chase
Term
V-CH-1
Definition
"Reactor building chiller; provides cooling to the following components: V-AC-10A/B, V-MZ-2, V-MZ-3, and V-CC-10."
Term
"V-EF-20, V-EF-21, V-EF-22"
Definition
Main Plant Exhaust system; takes suction from Reactor Building plenum and discharge to the atmosphere via Reactor Building Ventilation Stack. NOTE: the ventilation for all areas of the plant which have a potential for radioactive contamination is directed to the Plenum. AUTO S/D on SBGT initiation.
Term
V-AH-1 and V-AH-2
Definition
"Turbine Deck Air Handlers; auto start when temperature sensors (on ceiling of turbine deck) reach 250 degrees F; NO direct trip on auto initiation of SBGT, HOWEVER, upon the associated trip of V-EF-20, -21, -22, Plenum pressure will go slightly positive which will cause a trip (-0.2 inch water column)."
Term
V-EF-26
Definition
"Draws from SJAE room, exhausts to off-gas stack. EXHAUSTS TO PLENUM ON SBGT INITIATION. When not in service, V-EF-11 can draw off SJAE room."
Term
V-EF-11
Definition
"Normally, draws from Cond-Demin/MVP room and exhausts to plenum room. Can also back-up V-EF-26 which draws from SJAE room and discharges to off-gas stack (dilution fan suction). DRAWS from SJAE room on auto initiation of SBGT."
Term
Precaution associated with V-SF-3 and V-SF-4
Definition
Recirc MG Set supply fans; a sudden change in room temperature can set off fire deluge system.
Term
Plant operating requirement associated with V-AC-4 and V-AC-5
Definition
"Required to be operable to support operability of RHR and Core Spray pumps. Also, must be started within 13 minutes of all three pumps running."
Term
Plant operating requirement associated with V-SF-9 and V-SF-10
Definition
Required to be operable to consider respective Diesel Generator operable.
Term
General precaution associated with starting V-EF-24 (w.r.t. V-AC-10A/B).
Definition
V-AC-10A/B should be place in ON Prior to starting V-EF-24 (prevents drawing a large negative pressure in the Rx Building). The units will not start until V-EF-24 is started (prevents over pressurizing the Reactor building).
Term
General precaution associated with starting V-EF-28 (w.r.t. V-AH-4A/B).
Definition
"Either V-AH-4A OR V-AH-4B but not both, should be placed in ON prior to starting V-EF-28 to prevent drawing a large negative pressure in the Reactor Building."
Term
General precaution associated with V-FU-5 (w.r.t. V-EF-24).
Definition
"If both V-EF-24 fans are shutdown, V-FU-5 will shutdown due to high static pressure in the discharge duct of this fan. RESTART V-FU-5 after one of the V-EF-24 fans have been restarted."