Term
What are the Requirement Thresholds for MR CR 1.1, 1.2, and 1.3 Building Reuse? |
|
Definition
1.1 Building Reuse (Structure) is 75% 1.2 Building Reuse (Structure) is 95% 1.3 Building Reuse (Interior Non-Sturtural) is 50% |
|
|
Term
What are the requirement threshholds for MR CR 2.1 and 2.2 Const. Waste Management? |
|
Definition
2.1 Construction Waste Mgt. is divert 50% 2.2 Construction Waste Mgt. is divert 75% Exemplary Performance for diverting 95% |
|
|
Term
What are the requirement thresholds for MR CR 3.1 and 3.2 Materials Reuse? |
|
Definition
MR CR 3.1 Materials Reuse is 5% MR CR 3.2 Materials Reuse is 10% Exemplary Performance for Mat. Reuse is 15% **materials must no longer serve their original purpose, and must have been refurbished and installed for a different use or different location. |
|
|
Term
What are the requirement thresholds for MR CR 4.1 and 4.2 Recycled Content? |
|
Definition
MR CR 4.1 Recycled Content is 10% MR CR 4.2 Recycled Content is 20% Exemplary Performance for Recycled Content is 30% |
|
|
Term
What are the requirement thresholds for MR CR 5.1 and 5.2 Regional Materials? |
|
Definition
MR CR 5.1 Regional Materials is 10% MR CR 5.2 Regional Materials is 20% Exempl. Performance for Regional Materials is 40% |
|
|
Term
What are the requirement thresholds for MR CR 6 Rapidly Renewable Materials? |
|
Definition
MR CR 6 Rapidly Renewable Materials is 2.5% Exempl. Performance for Rap. Renewable Mat is 5% RR Materials include: bamboo, wool, cotton insulation, agrifiber, linoleum, wheatboard, strawboard, and cork. |
|
|
Term
What are the requirement thresholds for MR CR 7 Certified Wood? |
|
Definition
MR CR 7 Certified Wood is 50% Exemplary Performance for Certified Wood is 95% |
|
|
Term
What is the minimum distance a smoking area can be located in relation to an entry way, outside air intakes, and windows for EQ Prerequisite 2? (Environmental Tobacco Smoke) |
|
Definition
|
|
Term
What are the requirement thresholds for EQ CR 1 Outdoor Air Delivery Monitoring? |
|
Definition
Permanent Monitoring System must generate an alarm if conditions vary by 10% or more from set pt Monitor Carbon Dioxide in Densly Occ. Spaces (25 people or more per 1,000 sf) Non-Densly occupied spaces must monitor outdoor airflow rate to detect when the system is +/- 15% of the design "minimum outdoor air rate" |
|
|
Term
What are requirement thresholds for EQ CR 2 Increased Ventilation? |
|
Definition
Mech. vented increase O/A rates by 30% above minimum rates req. by ASHRAE 62.1-2004 Naturally Vented must meet standards of Carbon Trust...and CIBSE AND use diagrams/calcs to show design meets CIBSE OR use macroscopic, multi-zone, analytical model to predict airflows will ventilate 90% of spaces per ASHRAE 62.1-2004 |
|
|
Term
What are the requirement thresholds for EQ CR 3.2 Construction IAQ Mgt. Plan - Before Occupancy |
|
Definition
Flush-out prior to occupancy - 14,000 cf of O/A/sf while maintaining 60 deg F with < 60% humidity. Flush-out with early occupancy - 3,500 cf of O/A/sf, and ventilate at .30 cfm/sf for 3hours/day until 14,000 cf of O/A is delivered. Option 2 is Indoor Air Quality (IAQ) Testing |
|
|
Term
What is the requirement for EQ C4.4 Low-Emitting Materials (Composite Wood and Agrifiber Products)? |
|
Definition
No Added Urea-Formaldehyde |
|
|
Term
What are the requirements for EQ Cr 5 Indoor Chemical & Pollutant Source Control? |
|
Definition
Provide permanent entryway systems (6' long) Where chemicals or gases may be present in a room exhaust the space and have negative pressure at .50 cfm/sf and a pressure differential of 5 Pa (avg) and 1 Pa with doors closed Provide MERV 13 Filters |
|
|
Term
What is the req. for EQ C6.1 Controllability of Systems (Lighting)? |
|
Definition
Provide individual lighting controls for 90% of building occupants AND Controllability for all multi-occupant "shared" spaces |
|
|
Term
What is the req. for EQ C6.2 Controllability of Systems (Thermal Comfort)? |
|
Definition
Individual comfort controls for 50% of occupants Windows can be used in areas that are 20' inside of and 10' to either side of operable part of window AND Provide comfort system control for all multi-occupant "shared" spaces |
|
|
Term
What is the req. for EQ C7.2 Thermal Comfort Verification? |
|
Definition
Survey of bldg. occupants 6-18 mos. after occupancy Anonymous responses Develop a plan of Corrective Action in the case that more than 20% of occupants are dissatisfied. |
|
|
Term
What are the requirement thresholds for EQ C8.1 Daylighting and Views (Daylighting)? |
|
Definition
Opt. 1: Glazing Factor Calculation: Achieve min. glazing factor of 2% in a min. of 75% of reg oc. sp. Opt. 2: Daylight Simulation Model: must show min. 25 fc in min. 75% reg occupied spaces. Opt. 3: Daylight Measurement: must have min. 25 fc in min. 75% reg. occupied spaces. |
|
|
Term
What are the requirement thresholds for EQ C8.2 Daylighting & Views -- (Views)? |
|
Definition
Provide Direct line of sight to the outdoor environment via vision glazing (2'6" - 7'6") for occupants in 90% of reg occupied areas. No prescibed threshold for ex. performance (Case-by-Case) **Private Offices- the enitre SF can be counted if 75% or more of the area has a direct line of sight. |
|
|
Term
What are the requirement thresholds for SS C1 Site Selection? |
|
Definition
Do not develop bldgs., hardscape, roads, or parking on portions of the site that meet the following: Prime Farmland (USDA) Lower than 5' above 100 year flood (FEMA) Habitat for Endangered Species (Fed or State Lists) W/in 100' of wetlands (defined by U.S. CFR) Prev. Undev W/in 50' of a water body (Clean Water Act) Public Parkland (unless mitigated) |
|
|
Term
What are the requirement thresholds for SS C2 Development Density & Community Connectivity? |
|
Definition
Option 1: Development Density Prev. Dev. Site AND in a community w/ a min. density of 60,000 sf/acre. Option 2: Community Connectivity Prev. Dev. Site AND w/in 1/2 mile of residential zone w/ density of 10 units/acre AND w/in 1/2 mile of 10 Basic Services w/ ped. access from project. |
|
|
Term
What are the requirement thresholds for SS C4.1 Alternative Transportation - Public Transportation? |
|
Definition
Locate project w/in 1/2 mile of an existing, planned or funded, commuter rail, light rail or subway. OR Locate project w/in 1/4 mile of one or more stops from 2 or more Bus Lines |
|
|
Term
What are the requirement thresholds for SS C4.2 Alternative Transportation - Bike Storage and Changing Rooms? |
|
Definition
Commercial Projects: provide secure bike racks w/in 200 yards of entrance for 5% or more of bldg. users(at peak periods) AND provide shower and changing facilities for w/in 200 yds, for 0.5% of FTEs Residential Projects: provide covered storage facilities for securing bikes for 15% of building occupants in lieu of changing/shower facilities. |
|
|
Term
What are the requirement thresholds for SS C4.3 Alternative Transportation - Low-Emission & Fuel Efficient Vehicles? |
|
Definition
Option 1: Provide LE and FE Vehicles for 3% of FTE occupants AND Preferred Parking for them. Option 2: Provide Preferred Parking for LE and FE vehicles for 5% of Total Parking capacity on site. Option 3: Install Alternative-Fuel Refueling Stations for 3% of Total Parking capacity. |
|
|
Term
What are the requirement thresholds for SS C4.4 Alternative Transportation - Parking Capacity |
|
Definition
Option 1: Non-Residential: Not to exceed local zoning requirements, AND provide preferred parking for 5% of total parking spaces for carpool/vanpools. Option 2: For projects providing parking for less than 5% of FTEs: Provide preferred parking for carpools/vanpools, marked as such, for 5% of total. Option 3: Residential: Not to exceed local min. zoning requirement, AND provide infrastructure to facilitate vehicle ride sharing. Option 4: FOR ALL: NO new Parking. |
|
|
Term
What are the requirement thresholds for SS C5.1 Site Development - Protect or Restore Habitat |
|
Definition
Greenfield Sites: Limit Site Disturbance to: 40' beyond bldg. perimeter 25' beyond permeable surfaces 15' beyond curbs and utility branch trenches 10' beyond walkways, patios, parking, 12" dim. pipe Previously Developed: Restore/Protect a min. of 50% of site area w/ native or adaptive vegetation. Exemplery Performance: Restore/Protect 75%. |
|
|
Term
What are the requirement thresholds for SS C5.1 Site Development - Maximize Open Space? |
|
Definition
Option 1: Reduce footprint and/or Provide 25% more open space than zoning req. (50% - ex. perf.) Option 2: No Zoning Requirement: Provide open space equal to Footprint (Double Footprint -EP) Option 3: Ordinance Exists, but no Open Space Req. Provide 20% of site as open space (40% - EP) |
|
|
Term
What are the requirement thresholds for SS C6.1 Stormwater Design - Quantity Control? |
|
Definition
Imperviousness Less than 50%: prevent discharge rate from exceeding pre-development (1-2yr 24hr design storm) OR SWMP with stream channel protection strategy. Greater than 50% Imperviousness: SWMP results in 25% decrease in volume runoff from the 2 yr. 24-hr design storm. |
|
|
Term
What are the requirement thresholds for SS C6.2 Stormwater Design - Quality Control? |
|
Definition
Stormwater Management Plan: 1. Reduce Impervious Cover 2. Promote Infiltration 3. Captures & Treats the runoff from 90% of average annual rainfall using acceptable BMPs 4. BMPs must remove 80% of total suspended solids. |
|
|
Term
What are the requirement thresholds for SS C7.1 Heat Island Effect - Non Roof? |
|
Definition
Option 1: Combination of the following for 50% of hardscape: 1. Shade w/in 5 years 2. Paving materials w/ SRI of min. 29 3. Open Grid Pavement System Option 2: Min. of 50% of parking under cover (Roof must have SRI of at least 29) Exemplary Performance: 1. 100% non-roof impervious surfaces have high-albedo materials and/or open-grid or shaded w/in 5 years. 2. 100% parking under cover. |
|
|
Term
What are the requirement thresholds for SS C7.2 Heat Island Effect - Roof? |
|
Definition
Option 1: Roofing w/ SRI 78 (low slope) or SRI 29 (Steep slope) for min. 75% of roof structure. Option 2: Vegetated roof for 50% of roof area. Option 3: Combo of the above. Exemplary Performance: 100% Vegetated Roof. |
|
|
Term
What are the requirement thresholds for SS C8 Light Pollution Reduction? |
|
Definition
Interior Lighting: NO exit through windows, AND OFF During Non-working Hours. Exterior Lighting: Not to exceed 80% of lighting power densities for exterior areas, 50% for facades & landscape features. Classify LZ1 - LZ4 |
|
|
Term
What are the requirement thresholds for WE C1.1 Water Efficient Landscaping? |
|
Definition
Reduce potable water consumption by 50% from calculated mid-summer baseline case. WE C1.2 is NO potable water use for Irrigation or NO Irrigation |
|
|
Term
What are the requirement thresholds for WE C2 Innovative Wastewater Technologies? |
|
Definition
Reduce potable water use for sewage conveyance by 50% OR Treat 50% of waste water on-site to tertiary standards. Exemplary Performance - No Potable water use, or Treat 100% of waste water on-site. |
|
|
Term
What are the requirement thresholds for WE C3.1 and 3.2? |
|
Definition
3.1: 20% reduction in water use from baseline 3.2: 30% reduction in water use Exemplary Performance: 40% reduction, or 10% reduction in the process and non-regulated water use. |
|
|
Term
How many points can be earned through the different options in EA C1 Optimize Energy Perf? |
|
Definition
Option 1 - Whole Bldg Simulation (1-10 points) Option 2 - Adv. Energy Design guide for Small Office Buildings (4 pts) Option 3 - Adv. Bldgs. Core Performance (2-5pts) Option 4 - "Benchmark.." No longer available. |
|
|