Term
MS
Describe what SRVs are on each MS line. |
|
Definition
-A steam line: A & E. -B steam line: G & B. -C steam line: H & C. -D steam line: D & F. All good heavy dogs eat big chewy frogs. |
|
|
Term
MS
Describe the purpose of the flow restrictor. |
|
Definition
-Protect fuel barrier by limiting steam flow to 200% of rated in case of a main steam line rupture outside primary containment. -Also provides a means of measuring flow. |
|
|
Term
MS
Describe the power supplies to the MSIVs. |
|
Definition
-Inboard MSIVs: Y-70/D-11. -Outboard MSIVs: Y-80/D-21. |
|
|
Term
MS
Describe which line HPCI is aligned to. |
|
Definition
B steam line inside drywell. |
|
|
Term
MS
Describe which line RCIC is aligned to. |
|
Definition
C steam line inside drywell. |
|
|
Term
MS
Describe the blowout panels. |
|
Definition
-Assures Rx building integrity. -Designed to fail out from the steam chase to the turbine building floor. -D/P of .25psi. |
|
|
Term
MS
Describe which lines the steam jet air ejectors and recombiner steam are aligned to. |
|
Definition
Tap off of the A & B steam lines. |
|
|
Term
MS
Describe the group I isolation signals. |
|
Definition
-Rx low low water level: -47". -Hi MS flow: 135-140%. -Hi steam chase temp: 195-200F. -Low MSL pressure: 840# when in run. |
|
|
Term
MS
Describe what closes on a group I isolation. |
|
Definition
-MSIVs. -MSL drain valves. -RWCU sample valves. |
|
|
Term
MS
Describe which line the Rx head vent is aligned to. |
|
Definition
|
|
Term
MS
Describe the equalizing headers. |
|
Definition
-Equalizing header in drywell and steam chase to equalize pressure around MSIVs. -Equalizing line supplies turbine bypass valve header, turbine steam seal system regulator, and condenser deaerating system. -Equalizing line in hotside to allow testing of turbine stop valves at full power. |
|
|
Term
MS
Describe operation of MS drain valves. |
|
Definition
Valve open/closed signal is seal in. |
|
|
Term
MS
Describe the Main Steam Line Leakage alarm. |
|
Definition
If main steam line flow exceeds turbine first stage flow by 400,000lbs/hr or more after 30 second time delay. |
|
|
Term
MS
Describe the steam chase high temperature alarm setpoint. |
|
Definition
|
|
Term
MS
Describe radiation detection for MS. |
|
Definition
-MSLs monitored for radioactivity by chambers just downstream of outboard MSIVs. -Provide annunciation for upscale (6Rem) and downscale. -Trip the MVP on upscale alarm. |
|
|
Term
MS
Describe MSIV cycling time. |
|
Definition
-Between 3 to 9.9 seconds to close (air and spring). -Between 45 to 60 seconds excercise time (spring only). -During a LOCA MSIV springs may not be enough to shut valves due to drywell pressurization. |
|
|