Shared Flashcard Set

Details

Main Steam (MS)
BWR Systems
16
Other
Not Applicable
07/05/2012

Additional Other Flashcards

 


 

Cards

Term
MS

Describe what SRVs are on each MS line.
Definition
-A steam line: A & E.
-B steam line: G & B.
-C steam line: H & C.
-D steam line: D & F.
All good heavy dogs eat big chewy frogs.
Term
MS

Describe the purpose of the flow restrictor.
Definition
-Protect fuel barrier by limiting steam flow to 200% of rated in case of a main steam line rupture outside primary containment.
-Also provides a means of measuring flow.
Term
MS

Describe the power supplies to the MSIVs.
Definition
-Inboard MSIVs: Y-70/D-11.
-Outboard MSIVs: Y-80/D-21.
Term
MS

Describe which line HPCI is aligned to.
Definition
B steam line inside drywell.
Term
MS

Describe which line RCIC is aligned to.
Definition
C steam line inside drywell.
Term
MS

Describe the blowout panels.
Definition
-Assures Rx building integrity.
-Designed to fail out from the steam chase to the turbine building floor.
-D/P of .25psi.
Term
MS

Describe which lines the steam jet air ejectors and recombiner steam are aligned to.
Definition
Tap off of the A & B steam lines.
Term
MS

Describe the group I isolation signals.
Definition
-Rx low low water level: -47".
-Hi MS flow: 135-140%.
-Hi steam chase temp: 195-200F.
-Low MSL pressure: 840# when in run.
Term
MS

Describe what closes on a group I isolation.
Definition
-MSIVs.
-MSL drain valves.
-RWCU sample valves.
Term
MS

Describe which line the Rx head vent is aligned to.
Definition
The B MSL.
Term
MS

Describe the equalizing headers.
Definition
-Equalizing header in drywell and steam chase to equalize pressure around MSIVs.
-Equalizing line supplies turbine bypass valve header, turbine steam seal system regulator, and condenser deaerating system.
-Equalizing line in hotside to allow testing of turbine stop valves at full power.
Term
MS

Describe operation of MS drain valves.
Definition
Valve open/closed signal is seal in.
Term
MS

Describe the Main Steam Line Leakage alarm.
Definition
If main steam line flow exceeds turbine first stage flow by 400,000lbs/hr or more after 30 second time delay.
Term
MS

Describe the steam chase high temperature alarm setpoint.
Definition
165F.
Term
MS

Describe radiation detection for MS.
Definition
-MSLs monitored for radioactivity by chambers just downstream of outboard MSIVs.
-Provide annunciation for upscale (6Rem) and downscale.
-Trip the MVP on upscale alarm.
Term
MS

Describe MSIV cycling time.
Definition
-Between 3 to 9.9 seconds to close (air and spring).
-Between 45 to 60 seconds excercise time (spring only).
-During a LOCA MSIV springs may not be enough to shut valves due to drywell pressurization.
Supporting users have an ad free experience!