Term
One thing that has changed the way companies regard employees is the shift in the US economy toward the __________ and away from __________. |
|
Definition
service sector; manufacturing |
|
|
Term
In a successful quality management program, employees: |
|
Definition
• are given broad latitude • are encouraged to improvise • have the power to use their own initiative to correct and prevent problems |
|
|
Term
|
Definition
involves breaking down jobs into elemental activities and simplifying job design. |
|
|
Term
|
Definition
Comprises a set of tasks, elements, and job motions (basic physical movements); all the tasks performed by a worker |
|
|
Term
|
Definition
Individual, defined job activities that consist of one or more elements |
|
|
Term
Traditionally, _____ has been a measure of job efficiency. |
|
Definition
|
|
Term
In a piece rate wage system, pay is based on: |
|
Definition
|
|
Term
What was the catalyst for scientific management's widespread acceptance? |
|
Definition
|
|
Term
True or False: Assembly-line production meshed with the principles of scientific management. |
|
Definition
|
|
Term
What are the advantages of scientific management? |
|
Definition
Increased output, lower labor costs, ease of training or replacing employees |
|
|
Term
What are the limitations of scientific management? |
|
Definition
Boredom, lack of motivation, and physical and mental fatigue |
|
|
Term
|
Definition
A willingness to work hard because that effort satisfies an employee need |
|
|
Term
What can be used to improve motivation? |
|
Definition
• positive reinforcement and feedback • effective organization and discipline • fair treatment of people • satisfaction of employee needs • setting of work related goals • design of jobs to fit the employee • work responsibility • empowerment • restructuring of jobs when necessary • rewards based on company as well as individual performance • achievement of company goals |
|
|
Term
____________ developed Theory X and Theory Y. |
|
Definition
|
|
Term
What are the attributes of a Theory X employee? |
|
Definition
• dislikes work • must be coerced • shirks responsibility • Little ambition • security top motivator |
|
|
Term
What are the attributes of a Theory Y employee? |
|
Definition
• work is natural • self directed • controlled • accepts responsibility • makes good decisions |
|
|
Term
Two of Deming's 14 points refer to: |
|
Definition
employee education and training. |
|
|
Term
|
Definition
An employee learns more than one job; provides a safety measure with more job coverage; prevents boredom |
|
|
Term
|
Definition
The horizontal movement between two or more jobs according to a plan; requires crosstraining |
|
|
Term
The objective of job enrichment is to: |
|
Definition
create more opportunities for individual achievement and recognition by adding variety, responsibility, and accountability to the job. |
|
|
Term
|
Definition
Allows employees control over their work |
|
|
Term
Horizontal job enlargement |
|
Definition
An employee is assigned a complete unit of work with defined start and end |
|
|
Term
|
Definition
Giving employees authority to make decisions |
|
|
Term
Five of Deming's points for quality improvement relate to: |
|
Definition
|
|
Term
|
Definition
Part of a daily work schedule in which employees can choose time of arrival and departure |
|
|
Term
|
Definition
A nontraditional work location |
|
|
Term
What costs are associated with establishing an alternative workplace? |
|
Definition
• training • hardware and software • networks • phone charges • technical support • equipment |
|
|
Term
|
Definition
Employees work electronically from a location they choose |
|
|
Term
Through telecommuting, absenteeism can be reduced by as much as _____. |
|
Definition
|
|
Term
Self-motivation must be reinforced by ___________________. |
|
Definition
|
|
Term
|
Definition
An incentive plan joins employees and a common effort to achieve company goals, who share it again |
|
|
Term
|
Definition
Sets aside a portion of profits for employees at years end |
|
|
Term
Gainsharing programs provide __________ pay outs or bonuses. |
|
Definition
|
|
Term
Profit-sharing is more applicable to: |
|
Definition
higher level employees and executives. |
|
|
Term
Managing diversity is the process of: |
|
Definition
creating a work environment in which all employees can contribute to their full potential in order to achieve a company's goals. |
|
|
Term
|
Definition
Includes education, awareness, communication, fairness, and commitment |
|
|
Term
Frederick Herzberg identified attributes of good job design as: |
|
Definition
• an appropriate degree of repetitiveness • an appropriate degree of mental absorption • some employee responsibility • employee control over their own job • goals and feedback • opportunities for friendship • use of skills |
|
|
Term
What are the 3 elements to job design? |
|
Definition
Task, worker, and environmental |
|
|
Term
|
Definition
Determines how to do each task and how all the tasks fit together to form a job |
|
|
Term
Performance requirements of a task: |
|
Definition
• Time • accuracy • productivity • Quality |
|
|
Term
|
Definition
Determines the characteristics the worker must possess to meet the job requirements, the responsibilities the worker will have in the job, and how the worker will be rewarded |
|
|
Term
|
Definition
Refers to the physical location of the job in the production or services facility and the environmental conditions that must exist |
|
|
Term
|
Definition
The physical characteristics and location of a job |
|
|
Term
|
Definition
Fitting the task to the person in a work environment |
|
|
Term
|
Definition
Determines if worker and machine time are used efficiently; how much downtime |
|
|
Term
|
Definition
Individual job or work effort requiring labor, resources and time; is subject to management control |
|
|
Term
|
Definition
A unique, one time operational activity or effort |
|
|
Term
What is project management? |
|
Definition
It is the management of the work to develop and implement an innovation or change in an existing operation. It encompasses planning the project and controlling the project activities, subject to resource and budget constraints, to keep the project on schedule. |
|
|
Term
True or False: Project management is subject to less uncertainty than the normal management process. |
|
Definition
|
|
Term
What are the 3 major processes within project management? |
|
Definition
• planning • scheduling • controlling |
|
|
Term
What are the 8 basic elements of a project plan? |
|
Definition
• objectives • project scope • contract requirements • schedules • resources • personnel • control • risk and problem analysis |
|
|
Term
What is included in the objectives of a project plan? |
|
Definition
A detailed statement of what the project is to accomplish and how it will achieve the company's goals and meet that strategic plan; and an estimate of when it needs to be completed, the cost and the return |
|
|
Term
The control element of a project plan includes: |
|
Definition
procedures for monitoring and evaluating progress and performance including schedules and cost. |
|
|
Term
|
Definition
|
|
Term
|
Definition
Benefits of a project that cannot be measured in a tangible way (e.g., improving employee satisfaction) |
|
|
Term
Project teams are made up of: |
|
Definition
individuals from various areas and departments within a company. |
|
|
Term
|
Definition
A team structure with members from functional areas, depending on the skills required |
|
|
Term
|
Definition
A document that provides an understanding, justification, and expected result of a project |
|
|
Term
|
Definition
A written description of the objectives of the project; often prepared for individual team members, groups, departments, subtracters, and suppliers |
|
|
Term
Work breakdown structure (WBS) |
|
Definition
Breaks down a project into components (modules), subcomponents, activities, and tasks; provides the basis for developing a schedule |
|
|
Term
Organizational breakdown structure (OBS) |
|
Definition
A chart that shows which organizational units are responsible for work items |
|
|
Term
Responsibility assignment matrix (RAM) |
|
Definition
Shows who is responsible for the work in a project |
|
|
Term
The project schedule evolves from the ___________________. |
|
Definition
|
|
Term
What are the four basic steps of developing a schedule? |
|
Definition
1. Define the activities. 2. Sequence the activities. 3. Estimate the time required to complete each activity. 4. Develop the schedule. |
|
|
Term
|
Definition
A graph or bar chart with a bar for each project activity that shows the passage of time |
|
|
Term
|
Definition
The sequential relationship of project activities to each other |
|
|
Term
|
Definition
The amount of time an activity can be delayed without delaying the project |
|
|
Term
|
Definition
Resources are shifted from an activity with slack to an activity that is not on schedule; can push the project cost above budget |
|
|
Term
What are the key elements of project control? |
|
Definition
• Time management • Quality control • performance monitoring • Communication |
|
|
Term
|
Definition
The process of monitoring a project and developing timed status reports to make sure that goals are being met and the plan is being followed |
|
|
Term
Earned value analysis (EVA) |
|
Definition
A standard procedure for numerically measuring a project progress, forecasting its completion date and cost and measuring schedule and budget variation |
|
|
Term
A negative schedule variance means a project is __________ schedule. |
|
Definition
|
|
Term
Enterprise project management |
|
Definition
The management and control of a companywide portfolio of projects |
|
|
Term
In PERT, times are _________. |
|
Definition
|
|
Term
In CPM, times are ___________. |
|
Definition
|
|
Term
In PERT, activities are represented as ___________. |
|
Definition
|
|
Term
In CPM, activities are represented as _______________. |
|
Definition
|
|
Term
The advantage of CPM/PERT over the Gantt chart is: |
|
Definition
the use of a network to depict the precedence relationships between activities. |
|
|
Term
|
Definition
Nodes represent activities, and arrows show precedence relationships |
|
|
Term
|
Definition
Arrows represent activities and nodes are events for points in time |
|
|
Term
|
Definition
Two or more activities cannot share the same start and end nodes; does not represent any actual passage of time |
|
|
Term
True or False: AON is more common. |
|
Definition
|
|
Term
In an AON, the arrows show: |
|
Definition
precedence relationships between activities. |
|
|
Term
Are dummy activities required in an AON network? |
|
Definition
|
|
Term
Are dummy activities required in an AOA network? |
|
Definition
|
|
Term
A project cannot be completed sooner than the time required by the _________ path in the network. |
|
Definition
|
|
Term
|
Definition
The longest path through a network; it is the minimum project completion time |
|
|
Term
|
Definition
The earliest time an activity can start |
|
|
Term
|
Definition
Starts at the beginning of a CPM/PERT network to determine the earliest activity times |
|
|
Term
Earliest finish time (EF) |
|
Definition
The earliest start time plus the activity time; EF = ES + t |
|
|
Term
|
Definition
The latest time an activity can start without delaying critical path time; LS = LF - t |
|
|
Term
|
Definition
The latest time an activity can be completed and still maintain the project critical path time |
|
|
Term
|
Definition
Determines latest activity times by starting at the end of a CPM/PERT network and working forward |
|
|
Term
For the activities on the critical path, the earliest start times and latest start times are ____________. |
|
Definition
|
|
Term
|
Definition
|
|