MN3331 Test 1 Quiz Questions
Acquisitions Test 1
62
Management
Post-Graduate
10/14/2011

Additional Management Flashcards

 


 

Cards

Term
Management
Definition
Control, organize, plan, staff, lead
Term
Define Acquisitions
Definition
The term acquisition encompasses a myriad of activities from design, engineering, test & evaluation, to production and support of the system.
Term
21st Cultural Shifts
Definition
Fewer new systems; modified legacy systems, Joint programs, Affordability-driven systems
Term
Definition of Acquisition Success for Program Manager
Definition
System delivered on time, within cost, and meeting the warfighter's requirements
Term
Definition of Acquisition Success for Executive Branch
Definition
A program that satisfies national security objectives, provides a balanced force structure, and does not attract undue congressional scrutiny
Term
Definition of Acquisition Success for Defense Industry
Definition
A program that provides a positive cash flow, offers a satisfactory return on investment, and preserves competitive position
Term
Definition of Acquisition Success for Congress
Definition
A system that strikes a balance between defense and social needs and provides a fair distribution of defense dollars by state/district
Term
Definition of Acquisition Success for Warfighter
Definition
A system that is effective in combat and easy to operate and maintain
Term
In which type of program management organizational structure might one find the most potential for loyalty issues from the "hired" staff?
Definition
Matrix Structure
Term
What is Integrated Product and Process Development (IPPD)?
Definition
A management process that integrates all activities from the concept of a new defense system through the entire life cycle, using multidisciplinary teams, called integrated product teams
Term
What are some of the key tenets of Integrated Product and Process Development (IPPD)?
Definition
Proactive risk management, Customer focus, Early and continuous life cycle planning, Multi-disciplinary teamwork, Equal emphasis on product and process development, Focus on Robust Design and Improved Process Capability, Empowerment
Term
Which is a roadblock to effective Integrated Process Teams (IPTs)?
Definition
• Too many meetings
• Lack of participation and teaming
• Team members who can’t adapt
• Functional leader meddling
• Everyone responsible/no one responsible
• Lack of empowerment/capability
• Micro-management/Senior level tinkering
• Government-Contractor “Conflicts”
• IPTs formed where they don’t fit
Term
Oversight and review Integrating Program Teams (IPTs) include?
Definition
○ Overarching IPTs
○ Integrating IPTs
○ Working IPTs
Term
Overarching IPTs are used at what level?
Definition
Office of Secretary of Defense (OSD)level
Term
What is Analysis of Alternatives (AoA)?
Definition
Prepared by the lead Component to assess operational effectiveness, suitability, and life-cycle costs of potential materiel solutions to satisfy the capability need documented in the approved Initial Capabilities Document (ICD)
Term
This statutory body has the lead for oversight of the Joint Capability Integration and Development System (JCIDS) and validates and approves JCIDS documents for ACAT I and ACAT IA programs?
Definition
Joint Requirements Oversight Council (JROC)
Term
What are the capability documents supporting the Materiel Development Decision, Milestones A, B, & C, and the Full Rate Production Decision Review?
Definition
ICD, ICD, CDD, CPD and CPD respectively
Term
Capabilities-Based Assessment starts with a review of strategic guidance and answers these questions?
Definition
○ What is needed for the mission? (needs)
○ What are the problems and risks? (gaps)
○ What should we do about it? (solution)
Term
The Joint Capabilities Integration and Development system (JCIDS) was developed based upon these principles?
Definition
○ Born Joint
○ Top Down
Term
In which acquisition phase would you most likely find competing teams producing prototypes and demonstrating those prototypes in a relevant environment?
Definition
Technology Development
Term
Under the current acquisition framework, does Initial Operational Test and Evaluation (IOT&E) occur before or after Low Rate Initial Production (LRIP) assets are available?
Definition
After, because IOT&E is to be conducted using production or production-representative systems
Term
The purpose of this phase is to develop a system or an increment of capability; complete full system integration; develop an affordable and executable manufacturing process; and ensure operational supportability with particular attention to minimizing
the logistics footprint...
Definition
Engineering and Manufacturing Development
Term
The Materiel Development Decision (MDD) precedes entry into any phase of the acquisition process for...
Definition
All Programs
Term
Entrance criteria for the Engineering and Manufacturing Development phase includes?
Definition
○ A. Technology (including software) that has been demonstrated to work in a relevant environment
○ B. Approved Capability Development Document (CDD)
○ C. Fullfunding in the Future Years Defense Plan (FYDP)
○ D. (Answer) All of the above
Term
The decision authority for ACAT IAM programs is the:
Definition
Under Secretary of Defense (Acquisition, Technology and Logistics)
Term
Coordination between the Joint Capabilities Integration and Development System (JCIDS) and the Defense Acquisition System is essential for the success of Major Defense Acquisition Programs. Select the leader who sits on both the Joint Requirements
Oversight Council (JROC) and the Defense Acquisition Board (DAB)?
Definition
Vice Chairman, Joint Chiefs of Staff
Term
Average Procurement Unit Cost (APUC)
Definition
Procurement - Prime Mission Equipment
Procurement - Support Items
Procurement - Initial Spares
-Divided by Quantity-
Term
Program Acquisition Unit Cost (PAUC)
Definition
RDT&E - Prime Mission Equipment
RDT&E - Support Items
Procurement - Prime Mission Equipment
Procurement - Support Items
Procurement - Initial Spares
Military Construction – Facilities
-Divided by Quantity-
Term
If there was a Nunn-McCurdy breach in the program described in the previous two questions, which of the following would not be a consequence?
Definition
A. No new contracts could be awareded without MDA approval
B. (Answer for the quiz) The program must repeat the milestone A certification
C. An additional certification to Congress is required
D. The program must be restructured to address root causes of cost growth
Term
Stochastic scheduling is generally preferred over deterministic scheduling because?
Definition
it accounts for uncertainty
Term
Compared with a single-step acquisition strategy, an evolutionary (incremental) acquisition strategy with multiple increments will?
Definition
Require more milestone and decision reviews
Term
The Government Accountability Office (GAO) advocates that early "knowledge" in these three areas improves acquisition outcomes?
Definition
○ production maturity prior to MS C
○ technology maturity prior to MS B
○ design maturity at Critical Design Review (CDR)
Term
In regards to the critical path while scheduling, which of the following statements is false?
Definition
A delay of a non-critical will always delay the entire project.
Term
JCIDS
Definition
Joint Capabilities Integration and Development System
Term
PPBE
Definition
Planning, Programming, Budgeting, & Execution
Term
DAB
Definition
Defense Acquisition Board
Term
MDA
Definition
Milestone Decision Authority
Term
ADM
Definition
Acquisition Decision Memorandum
Term
TD
Definition
Technology Develoment
Term
EMD
Definition
Engineering and Manufacturing Development
Term
SAR
Definition
Selected Acquisition Report
Term
DAES
Definition
Defense Acquisition Executive Summary
Term
APB
Definition
Acquisition Program Baseline
Term
DAWIA
Definition
Defense Acquisition Workforce Improvement Act
Term
ICD
Definition
Initial Capabilities Document
Term
CDD
Definition
Capability Development Document
Term
CPD
Definition
Capability Production Document
Term
JCS
Definition
Joint Chiefs of Staff
Term
OSD
Definition
Office of Secretary of Defense
Term
DoD
Definition
Department of Defense
Term
KPP
Definition
Key Performance Parameter
Term
KSA
Definition
Key System Attributes
Term
DAE
Definition
Defense Acquisition Executive
Term
CAE
Definition
Component Acquisition Executive
Term
ACAT
Definition
Acquisition Category
Term
AoA
Definition
Analysis of Alternatives
Term
LRIP
Definition
Low Rate Initial Production
Term
FRP
Definition
Full Rate Production
Term
CDR
Definition
Critical design review
Term
DCR
Definition
DOTMLPF Change Request
Term
IPPD
Definition
Integrated Product and Process Development
Term
DOTMLPF
Definition
Doctrine, Organization, Training, Material, Leadership and Education, Personnel, & Facilities