Term
|
Definition
Organizes/classifies info into groups
Makes large amounts of data more digestible by grouping information into common themes
Think post-its grouped together |
|
|
Term
Cause-and-effect diagram Also Ishikawa or “fishbone” diagram |
|
Definition
Trace undesirable effect back to root cause |
|
|
Term
Cumulative flow diagram (CFD) |
|
Definition
How different tasks under a project are progressing from to-do to done
Chart of features completed over time, in dev, and in backlog.
[image] |
|
|
Term
|
Definition
How often something will happen Bar chart |
|
|
Term
Project schedule network diagram |
|
Definition
a flowchart that illustrates the logical and sequential relationships between tasks in a project - floats and lead/lag
output from the "sequencing activities" |
|
|
Term
Resource Assignment Matrix (RAM) |
|
Definition
Uses the Work Breakdown Structure (WBS) and the organizational structure to link deliverables and/or activities to resources |
|
|
Term
|
Definition
Relationships between two variables
Ice cream sales vs temperature/weather Product purity vs iron levels |
|
|
Term
|
Definition
Cumulative cost over specified period of time
allows tracking the progress of a project's aspect over time
E.g. is something on budget and schedule? |
|
|
Term
|
Definition
Model of features and functionality desired - holistic view of what is being built
Think post-its of Epic, features, stories |
|
|
Term
|
Definition
Accepted deliverables over time or how much team is producing in given time
Scatter diagram or bar chart (histogram) |
|
|
Term
|
Definition
Used to eliminate waste
Where time is spent that does not add value to the product being built [image] |
|
|
Term
|
Definition
Gain insights into the behaviour, predictability, and stability of a process over time
Mean (central) line with upper limit and lower limit
lines[image] |
|
|