Source Selection Authority - Reviews recommendation of SSAC (or SSET)) Selects contractor - May go against SSAC Recommendation |
|
|
Term
|
Definition
Source Selection Advisory Council
Compares Contractor vs Contractor |
|
|
Term
|
Definition
Source Selection Evaluation Board
Evaluates each proposal vs source selection evaluation criteria |
|
|
Term
|
Definition
Source Selection Evaluation Team
SSAC + SSEB |
|
|
Term
Who makes the decision on the vendow or contractor |
|
Definition
|
|
Term
Does the SSA have to follow the advice of the SSAC or SSET |
|
Definition
No - SSA may or may not use the recomendation of the SSAC |
|
|
Term
|
Definition
THe contractor that provides the best value after considering all factors of RFP - not just cost |
|
|
Term
|
Definition
Section of RFP that provides Instructions and Notices to Offerors |
|
|
Term
|
Definition
The part of RFP that evaluates criteria. Gov uses to asses RFP. |
|
|
Term
Benefits of RFP Oral Proposals |
|
Definition
Improved Communication, Redusced Source Selection Time, Reduces Contractor Proposal Cost |
|
|
Term
|
Definition
Provides info on contractors financial, organizational, and operational status |
|
|
Term
|
Definition
Will evaulate proposals for cost realism |
|
|
Term
|
Definition
Developmental Testing Item meets its specifications |
|
|
Term
|
Definition
Operational Testing Item Meets the Users Requirements |
|
|
Term
|
Definition
Testing results reported to Congress |
|
|
Term
|
Definition
BLRIP Report (Effectiveness and Suitability) |
|
|
Term
|
Definition
Vulnerability (Survivability) and Lethality Testing |
|
|
Term
|
Definition
Beyond Low Rate Initial Production Report - Satutory requirements of Title 10 USC 2399. DOT&E analyzes the results of IOT&E conducted for each MDAP |
|
|
Term
|
Definition
Initial Operation Test and Evaluation |
|
|
Term
|
Definition
Director, Operational Test and Evaluation |
|
|
Term
|
Definition
Under Secretary of Defense for Acquisition, Technology, and Logistics |
|
|
Term
|
Definition
Interoperability Testing - JITC Joint Interoperability Test Command |
|
|
Term
|
Definition
Statutory - Results Reported to Congress
Regulatory - Iteroperability Testing - JITC |
|
|
Term
|
Definition
Early Operational Assesment |
|
|
Term
|
Definition
An OA conducted early in the acquisition program, often of sub system or prototype to evaluate the potential. |
|
|
Term
|
Definition
Post MS-B Evaluation of Operatioinal Effectiveness (OE) and Operational Suitability (OS) |
|
|
Term
|
Definition
Post MS-B Evaluation of Operatioinal Effectiveness (OE) and Operational Suitability (OS) |
|
|
Term
|
Definition
EOA is Pre MS B OA is Post MS B IOT&E is post LRIP |
|
|
Term
|
Definition
Precursor to IOT&E, Duing the EMD Phase, Developed after CDR |
|
|
Term
|
Definition
Shorten the schedule, Optimize Test Assets, Cost Savings |
|
|
Term
|
Definition
Cost as an Independend Variable |
|
|
Term
|
Definition
formal and informal inquires must be answered quickly. Work through legislative liason office |
|
|
Term
|
Definition
Cost growth and CAIV must be closely managed to avoid OSD, COst Assessment and Program Evaluation (CAPE) and other questions |
|
|
Term
|
Definition
a majpr system that is user occupied and designed to provide protection |
|
|
Term
|
Definition
Form 1494 is sent to MCEB |
|
|
Term
MDA must include a statement in the ____ that statutory required certifications have been made |
|
Definition
ADM - Aquisition Decision Memorandum |
|
|
Term
|
Definition
organized/systematic approach that analyzes the function of system, equipment, facilities, services and supplies to ensure they achieve their essential functions at the lowest lifecycle costs consistent with required performance, reliability, quality and safety |
|
|
Term
What milestone is a program officially initiated |
|
Definition
|
|
Term
Defines authoritive, measurable, and testable parameters across one or more increments of a material capabilities solution by setting KPP and Key System Attributes neceesary to design and propose to programatic baseline. |
|
Definition
Capabilities Development Document (CDD) |
|
|
Term
The ___ must be validated before the Pre-Engineering and Manufacturing Development (EMD) and supports MS B. |
|
Definition
|
|
Term
The CCD has to be approved before ____ |
|
Definition
|
|
Term
___ is responcible for disposal plan |
|
Definition
|
|
Term
Full funding secured for life of program |
|
Definition
|
|
Term
|
Definition
Need to approve FMS sale before IOT&E |
|
|
Term
MDA certification and signature is required at MS ____ |
|
Definition
|
|
Term
ACAT I programs require ____ from MDA at MS |
|
Definition
|
|
Term
|
Definition
Types of congressional inquires. |
|
|
Term
How many days do you have to respond to a formal congressional inquiry |
|
Definition
|
|
Term
What TRL level is required for MS B to incorporate technology |
|
Definition
|
|
Term
WHo valildates KPP changes |
|
Definition
|
|
Term
|
Definition
|
|
Term
Manufacturing and Production Risk |
|
Definition
UNsatble requirements design, quantities, rates Special tooling Subcontractor Management |
|
|
Term
|
Definition
|
|
Term
|
Definition
Best Manufacturing Practices Center for Excellance - Production Risk Reducer |
|
|
Term
What MRL level do you need for CDR? |
|
Definition
|
|
Term
|
Definition
Assess survivability and lethality |
|
|
Term
|
Definition
System that is human occupied |
|
|
Term
|
Definition
Waiver excuses covered systems from full up LFT&E -- submit a plan to test sub components |
|
|
Term
|
Definition
Must submit DD 1494 to MCEB |
|
|
Term
|
Definition
Program Aquisition Unit Cost - Program Aquisition Cost / Program Quantity
Average Procurment Until Cost |
|
|
Term
|
Definition
APB Threshold - Report to MDA APB Deviation Report |
|
|
Term
15% above current 30% above baseline |
|
Definition
Nunn McCurdy Significant Breach - Notify Congress |
|
|
Term
25% above current APUC and PAUC 50% above baseline |
|
Definition
Nun-McCurdy Critical Breach Congress Notified SECDEF Termination or Certification |
|
|
Term
|
Definition
Unit Cost report is submitted by PM to CAE |
|
|
Term
SECDEF Submits a ___ and certification to Congress for a cost breach |
|
Definition
|
|
Term
What percentage life cycle cost is O&S |
|
Definition
|
|
Term
|
Definition
Required at MS B and C CAPE does independent cost assesment |
|
|
Term
2 types of Affordability assesment |
|
Definition
Projected Annual Approach - will address man power and funding over 6 year period
Unit Cost - compare unit cost of earlier predecessor |
|
|
Term
|
Definition
Single point of accountability for lifecycle systems management including sustainment |
|
|
Term
|
Definition
Implements the support stragety and adjust performance requirements across PSI PSM coordinates the entire package of who is providing what service to whom |
|
|
Term
|
Definition
responcible for the activities and output of one or more product support providers |
|
|
Term
|
Definition
Product Support Agreement - Contract, task order, or any type of agreement within the federal Gov for the performance of system |
|
|
Term
Supportability Performance Cost Driver |
|
Definition
Address up front and early to reduce cost |
|
|
Term
|
Definition
Trades with schedule and performance to reach goals |
|
|
Term
|
Definition
Ao requires MLDT Mean logistics delay time.
Aa is reliability Ai is maintainability |
|
|
Term
|
Definition
Production Readiness Review Asses MRL - Manufaturing Readiness Level Engineer Manufacturing Development Phase EMD |
|
|
Term
MAnufacture Risk will be delt with by participating in ___ |
|
Definition
IPT, establish performance targets, meet manufacturing goals |
|
|
Term
TAFT is used in DT or OT? |
|
Definition
|
|
Term
|
Definition
Helps Reduce cost, production, and sustainment |
|
|
Term
Who determines what is covered in LFT&E |
|
Definition
|
|
Term
MDA can change certification without congress approval |
|
Definition
Program Certification at MS B 10 USC 2366b |
|
|