Term
Rad Mon
Describe where CAMs are located. |
|
Definition
-1 at recombiner. -1 at offgass. -8 mobile and semimobile. |
|
|
Term
Rad Mon
Describe the main steam line rad monitors. |
|
Definition
-Tip MVP and close MVP suction valves at 6r/hr. -1 of 2 logic. -A&C RPS bus A. -B&D RPS bus B. |
|
|
Term
Rad Mon
Describe the off gas pretreatment monitors. |
|
Definition
-Trips SJAE second stage inlet (AO-1085A/B) and recombiner outlets (AO-7557A/B) after 30 minute time delay. -Trips on 2 signals upscale/downscale/combination. -Channel A is RPS bus A. -Channel B is RPS bus B. -30 minute timer is Y10. -Trip relays is 24Vdc div I. |
|
|
Term
Rad Mon
Describe the stack WRGMs. |
|
Definition
-Cause a stack isolation (CV-1928/2353 &SV-7677). -Monitor Noble gas radioactivity level of effluent gas discharge. -Channel A is Y70. -Channel B is Y80. |
|
|
Term
Rad Mon
Desbribe the RB vent WRGMs. |
|
Definition
-Select to any vent plenum. -Has alarms. -Channel A Y70. -Channel B Y80. |
|
|
Term
Rad Mon
Describe the process liquid rad monitors. |
|
Definition
-RBCCW. -SW. -Rad Waste (not utilized). -Discharge canal (2 channels). -TB normal waste sump (2 channels). -Only normal waste sump has trips (trips pumps). Y-30/10 A/B. |
|
|
Term
Rad Mon
Describe the vent plenum monitors. |
|
Definition
-Isol sec containment, starts SBGT, EFT hi rad mode, MVP trip and isolation, off gas storage vent to recirc, AO-2982 close, V-EF-26 discharge to plenum. -26mrem/hr, 1 high or 2 lo (.1). -A/B RPS bus A/B. -Loss of power is false high. |
|
|
Term
Rad Mon
Describe the fuel pool monitors. |
|
Definition
-Isolates sec containment, starts SBGT, EFT hi rad mode, MVP trip and iso, off gas storage vent to recirc, AO-2982 close, V-EF-26 discharges to plenum. -1 high at 50mrem/hr or 2 lo .1mrem/hr. -Channels A/B powered by RPS bus A/B. -Loss of power is false high. |
|
|
Term
Rad Mon
Describe teh CRV-EFT monitors. |
|
Definition
-Air intake at 250Vdc battery. -Hi-Hi at 1mr/hr on either channel causes high rad mode in EFT. -Alarm at .5mr/hr. -Channels A/B powered by MCC-134/144. |
|
|
Term
Rad Mon
Describe the drywell particulate monitor. |
|
Definition
-Isolates on Gr II. -Powered by L-28. -Discharges to plenum or TORUS. |
|
|
Term
Rad Mon
Describe the sewer lift station monitor. |
|
Definition
-Alarms and trips pumps on high rad. -Failure or loss of power disables pumps. |
|
|
Term
Rad Mon
Describe the hard pipe vent monitor. |
|
Definition
-Monitors effluent from TORUS. -Powered by Y80. |
|
|
Term
Rad Mon
Describe radiation w/HWC. |
|
Definition
-HWC rate increased rases levels in steam chase, condenser hot side, turbine operating floor, SJAE room, and recombiner by 3-5 times. |
|
|
Term
Rad Mon
Describe loss of Y10. |
|
Definition
-Norm waste sump monitor Hi/Inop alarm. -Loss of trip function for preconditioning monitor (man trip after 30mins). -Off gas stack iso valves fail open and will not close on stack WRGM high rad. - |
|
|
Term
Rad Mon
Describe loss of Y20. |
|
Definition
-Lose ARM indication. -Lose rad monitoring from recombiner instrument and pump room. |
|
|
Term
Rad Mon
Describe loss of Y30. |
|
Definition
Get TB norm wast sump monitor Hi/inop alarm. -Lose indication of normal waste sump rad and radwaste release to canal. |
|
|
Term
Rad Mon
Describe loss of Y70. |
|
Definition
-Drywell cam trouble due to Gp II isolation. -Lose DW rad mon 'A'. -Stack effluent and RBV effluent alarms. -Loss of stack and RBV indications. |
|
|
Term
Rad Mon
Describe loss of Y80. |
|
Definition
-Drywell cam trouble due to Gp II iso. -Loss of DW rad mon 'B'. -Stack effluent and RBV effluent alarms. -Loss of stack and RVB indications. -Loss of HPV indications. |
|
|