Term
Function of RHR Service Water |
|
Definition
"Supply strained river water to the RHR heat exchangers which remove heat rejected by the RHR system during normal reactor shutdown cooling, during reactor isolation or accident conditions, and during the time when the fuel pool has an emergency heat load from spent fuel. Also, the system can provide an inexhaustible supply of cooling water to the core by pumping river water through LPCI lines." |
|
|
Term
|
Definition
Two separate, redundant loops, each capable of providing the cooling requirements for a DBA LOCA (and the less demanding reactor S/D cooling mode). |
|
|
Term
Purpose of RHRSW basket strainers |
|
Definition
Reduce the possibility of plugging the heat exchangers. |
|
|
Term
Indication of RHRSW strainer plugging |
|
Definition
5 psid as indicated by alarm in control room. |
|
|
Term
Minimum flow required to prevent RHR motor thrust bearing from overheating. |
|
Definition
|
|
Term
Various sources of seal water to RHRSW pump. |
|
Definition
When shutdown: seal water system; when operating: self-sealed |
|
|
Term
Connection between RHRSW and Service Water system |
|
Definition
Service Water system provides RHRSW keep-fill to maintain discharge header pressurized and full of water under normal conditions. |
|
|
Term
Through which loop can RHRSW provide emergency makeup to the vessel? |
|
Definition
|
|
Term
Where does RHRSW enter the Reactor building? |
|
Definition
NE corner above ground floor. |
|
|
Term
Connection between RHRSW and Demin Water system |
|
Definition
Demin can be used to flush the heat exchangers. |
|
|
Term
Where does RHRSW discharge? |
|
Definition
Into a common discharge line for all the Service Water Systems in the Reactor Building which eventually meets up with the Circulating water system discharge line (upstream of the radiation monitor). |
|
|
Term
Discuss the differential pressure between RHRSW and RHR in the heat exchanger. |
|
Definition
"Differential control valve, normally manually operated, maintains RHRSW discharge pressure from HX at least 20 psid above RHR inlet to HX pressure. Acceptance criteria for minimum RHRSW dP is such that under worst case conditions and 1 RHRSW pump in service, the RHRSW system will maintain at least 20 psi above the max RHR pressure expected at the HX." |
|
|
Term
Why is RHR HX dP maintained the way it is? |
|
Definition
It is maintained such that RHRSW is at least 20 psi greater than RHR pressure at the HX to prevent the possibility of radioactive water (in the event of a tube leak) being discharged to the river. |
|
|
Term
Normal shutdown cooling range |
|
Definition
From 281 degrees F and 50 psia (steam supply pressure insufficient to maintain turbine shaft seals and vacuum in the main condenser cannot be maintained) to 125 degrees F in 24 hours. |
|
|
Term
When is torus cooling placed in service? |
|
Definition
Following RCIC operation or testing of HPCI, OR whenever suppression pool water approaches 90 degrees F. NOTE: minimum torus temperature is 65 degrees F. |
|
|
Term
Discuss RHRSW operation upon ECCS initiation signal from LPCI Control system (normal power available). |
|
Definition
RHRSW pumps will be tripped if they are running. Pumps can not be re-started unless ECCS signal clears or the keylocked bypass switch is operated. |
|
|
Term
Discuss RHRSW operation upon ECCS initiation signal from LPCI Control system (coincident with loss of off-site power). |
|
Definition
Initiation of automatic loading sequence, combined with the ECCS initiation signal, will automatically trip and lock out the RHRSW pumps. Lock-out will remain until: ECCS initiation signals from core spray and LPCI control systems are terminated or bypassed and an RHR pump is stopped; Normal power is restored to the essential bus and the ECCS initiation signal from LPCI is terminated or bypassed; OR Keylock bypass switch is taken to Manual Override. |
|
|
Term
"Under conditions of DBA, how many RHR pumps in LPCI mode are required to restore reactor water level? How many are then required to maintain greater than two-thirds core height?" |
|
Definition
Two are required to restore level. One is required to maintain greater than 2/3 core height. |
|
|
Term
Interlock between RHRSW HX discharge valve and RHRSW pump. |
|
Definition
RHRSW HX disch valve is interlocked to close whenever the RHRSW pumps are tripped or stopped. |
|
|
Term
Normal air supply to RHR valves; Supply on loss of normal air. |
|
Definition
"Normal: Instrument air; Upon loss of plant air, air is supplied by aux air compressors to hold valves closed or modulate them." |
|
|
Term
Purpose of main service water discharge header radiation monitoring |
|
Definition
Warn operators of a system leak that could cause radioactive water to be discharged to the river. |
|
|
Term
Operating requirement regarding RHRSW heaters on pump motors |
|
Definition
Should remain in service continuously when the pumps are on standby duty. |
|
|
Term
Operating requirement regarding RHRSW loop A and B X-tie |
|
Definition
Must be maintained closed in the standby condition. |
|
|
Term
RHRSW strainer dP that should not be exceeded |
|
Definition
|
|
Term
RHRSW Pump start limitations |
|
Definition
Two successive motor starts from ambient or one start from rated temperature are allowed. For subsequent starts allow 30 minutes running time at full speed or 60 minutes idle time. |
|
|
Term
Minimum and Maximum flow limits for RHRSW pumps |
|
Definition
|
|
Term
Emergency or abnormal RHRSW pump flow limit |
|
Definition
6000 gpm (runout may occur beyond this limit) |
|
|
Term
RHR temperature at HX where RHRSW loop SHALL remain in operation. Why? |
|
Definition
Greater than 200 degrees F RHR temperature at HX inlet to ensure voiding of RHRSW does not occur within the HX or piping. |
|
|
Term
Discuss excessive RHRSW pump packing leakage (briefly). |
|
Definition
Excessive pump packing leakage or loss of seal water to the RHRSW pumps will NOT prevent the pumps from performing their safety function. |
|
|
Term
Briefly discuss the issue of dead heading RHRSW pumps. |
|
Definition
Do not dead head pumps for more than 7 minutes. Vortexing is not a concern and NPSH does not become a factor until approximately 7 minutes after dead head (due to rise in temperature). |
|
|
Term
Connection between RHRSW and Service Water system |
|
Definition
Service Water system, through cross-ties to each division of RHRSW, keeps RHRSW piping full of water when in a standby condition at a minimum of 6 psig. HOWEVER, this pressure is not required for operability." |
|
|
Term
Discuss the concern when physically removing an RHRSW pump. |
|
Definition
Adversely affects the seismic qualification of the associated division and appropriate tech spec must be entered. |
|
|
Term
Concern with placing RHRSW PMP LPCI/ECCS LOAD SHED OVERRIDE switch in manual override when neither a valid ECCS nor LPCI initiation signal is present. |
|
Definition
Results in inoperability of 2R and 1R Transformers because the AC Load study assumes all RHRSW pumps are off prior to the ECCS load sequencing. The bypass of any of the RHRSW load sheds while a pump is operating puts the associated normal off-site power supply in an unanalyzed condition. |
|
|
Term
#11 RHRSW Pump Motor power supply |
|
Definition
|
|
Term
#13 RHRSW Pump Motor power supply |
|
Definition
|
|
Term
#14 RHRSW Pump Motor power supply |
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
|
Definition
|
|
Term
#11 RHR Aux Air Compressor power supply |
|
Definition
|
|
Term
#12 RHR Aux Air Compressor power supply |
|