Term
SRV
Describe the SRV purpose. |
|
Definition
Designed to maintain Rx pressure below the ASME code limit of 110% of vessel design pressure (110% x 1250psig = 1375psig). |
|
|
Term
SRV
Describe the SRV self actuation setpoint. |
|
Definition
-1109psig +/- 1%. -30psig blowdown to 1079psig. |
|
|
Term
SRV
Describe an SRV being open affect on the Rx. |
|
Definition
-2 bore sizes for the SRVs. -Rated at approx. 800,000lbm/hr each. -1 SRV open drops Rx level at 20"/min. |
|
|
Term
SRV
Describe the bellows high pressure. |
|
Definition
-5 psig. -Renders safety function inoperable. |
|
|
Term
SRV
Describe the tailpipe alarm setpoint. |
|
Definition
|
|
Term
SRV
Describe the concern from pilot leakage. |
|
Definition
Could cause a spurious lift of an SRV. |
|
|
Term
SRV
Describe the pneumatic supply to SRVs. |
|
Definition
-All normally supplied by instrument N2. -All non-safety B/U is instrument air. -SRVs A,B,E safety B/U is 'A' Alt N2. -SRVs C,F,H safety B/U is 'B' Alt N2. -SRVs D,G safety B/U is accumulators. |
|
|
Term
SRV
Describe which SRVs are on which MSLs. |
|
Definition
-A has A and E. -B has G and B. -C has H and C. -D has D and F. All good heavy dogs eat big chewy frogs for inboard outboard. |
|
|
Term
SRV
Describe the ADS initiation signals. |
|
Definition
-Low low Rx level of -47". -A/C interlock met (100# on discharge of ECCS pump). -107 second timer timed out. -These are and statement. |
|
|
Term
SRV
Describe the operation of ADS for different signals. |
|
Definition
-Timer resets if water level rises above -47" while timer is running. -Once timer has runout, ADS seals in. -Inhibit switches stop ADS anytime. -Loss of the A/C interlock stops ADS anytime. |
|
|
Term
SRV
Describe which SRVs are on ADS. |
|
Definition
|
|
Term
SRV
Describe which SRVs are on lo lo set. |
|
Definition
|
|
Term
SRV
Describe ADS logic power. |
|
Definition
-Bus A: 125Vdc D-11 Ckt 10. -Bus B: 125Vdc D-21 Ckt 12 (Bus A is b/u). |
|
|
Term
SRV
Describe SRV solenoid power. |
|
Definition
-Bus A: D-11. -Bus B is backup: D-21. |
|
|
Term
SRV
Describe the purpose of lo lo set. |
|
Definition
Help prevent water from climbing up the SRV tail pipe and protecting primary containment. |
|
|
Term
SRV
Describe the lo lo set initiation signal. |
|
Definition
-Full SCRAM signal from both: -Div 1 A: backup scram valve energized. -Div 2 A & B: SDV vent and drain pilot valves de-energized.
-Lo lo set in AUTO. |
|
|
Term
SRV
Describe the effect of resetting a SCRAM on lo lo set. |
|
Definition
-Ability to use lo lo set is lost. |
|
|
Term
SRV
Describe the lo lo set SRV setpoints. |
|
Definition
-H: 1052#. -G: 1062#. -E: 1072#. -All have a 80# blowdown. |
|
|
Term
SRV
Describe lo lo set after a SRV has lifted. |
|
Definition
-Prevents reopening for any reason (except mechanical lift) for 10 seconds to ensure discharge line water leg clears. -Limits thermal hydraulics. |
|
|
Term
SRV
Describe how to tell if an SRV is open. |
|
Definition
-Signal of open w/ 30psid between drywell and tailpipe. |
|
|
Term
SRV
Describe the indication lights for SRVs. |
|
Definition
-Green indicates solenoid valve is de-energized. -Amber indicates that 30psid exists in tailpipe. -Red indicates power supplied to solenoid. |
|
|
Term
SRV
Describe where SRVs can be operated from. |
|
Definition
-A through D (A,C,D are ADS) can only be operated from C-03. -A,C,D have OPEN and AUTO positions. -B has OPEN and CLOSED positions. -E,F,G,H (E,G,H are lo lo set) can be operated from C-03, C253-D and ASDS. -E,G,H have AUTO, OPEN and CLOSED on C-03 and ASDS. -E,G,H have AUTO and CLOSED only on C253-D. -F has CLOSE and OPEN only on all 3 panels. |
|
|
Term
SRV
Describe how many solenoids on each SRV. |
|
Definition
-A through D have 1 solenoid each. -E through H have 2 solenoids each. |
|
|