Term
|
Definition
Remove decay heat from the core and RCS during plant cool down and RFO. Transfer refueling water between RWST and Refuel Cavity.
ECCS:
RWST- Cold Leg Injection
Containment Sump- Cold Leg Recirc
Containment Sump- SI and CH Pp Suction
Containment Sump- Containment Spray Headers |
|
|
Term
|
Definition
Remove residual and sensible heat for plant cooldown; usually placed in service within 4 hours of Shut down when RCS pressure is < 375 psig and temp < 350F (mode 4); 350F to 140F in 22 hours (with only one loop in service the time will double.)
Piping and Valve Design Basis:
Suction Piping 450 psig/400F
Discharge Piping 600 psig/400F
Pp Seals 350 F
RCS Isolation Valves 2485 psig/650F
ECCS:
Normally aligned to RWST and disch. to all 4 Cold Legs, RH 19s must be open to meet this phase (Injection Phase)
Takes a suction on the containment sump when RWST is depleted and Containment Sump has adequate inventory to support Pp operation during Recirc Phase.
Discharge to cold legs
Can Discharge to Hot Legs
Supplies SI and Ch Pp suction
Supplies 1 CS Header
RHR Shut off head is 170 psig
RHR is required to achieve safe Shut down. System is used for cold Shut down outside MCR.
|
|
|
Term
|
Definition
Location- 45 Aux Bldg
Design:
Pressure 600 psig, Temperature 350F, Flow Normal 3000 gpm @ 151 psid, Flow Accident 4500 gpm @ 130 psid
Mechanical Seal Cooled by CCW
Power Supplied 21- 2A 4KV Vital Bus, 22- 2B 4 KV Vital Bus
Pp start:
MCR Bezel CC1
Auto Start SEC SI Modes (I, III, IV).
THERE ARE NO MODE 2 STARTS
Pp Trips:
Bus Overload (motor overcurrent)
Bus Diff (SEC Modes 2.3.4 have load strip)
Room Cooler Supplied by SW. |
|
|
Term
|
Definition
ECCS Pp suction source- Injection
Make Up for Filling Refueling Cavity- Mode 6
Suction Source for CS
400,000 gallon capacity, vented to Aux Building
Make up via CVCS
TS-3.5.5 limits
Min Level- 364,500 gallons
Boron Concentration- 2300-2500 ppm
Temperature 35 F
RWST Heating Loop- Auto start/stop to maintain RWST between 40-45F, Heat trace maintain >50F, Alarm if temp is <40F, temp controller recieves input from AFWST.
Purification-
Refueling water purification Pp
SFP cooling demineralizer and filter
Flow path can also purify cavity or transfer water from cavity to RWST
|
|
|
Term
|
Definition
Single Loop shell and U tube HX, designed to handle 1/2 the DBA load.
Shell (CCW) @ 150 psig and 200F
Tubes (RHR/RCS) @ 600 psig and 400F |
|
|
Term
MOVs- RH4 RHR Pp Suction Valves Specs and Interlocks |
|
Definition
Normally open
55 Aux Bldg
87 Stroke Time
Power- 21RH4- A 230V AC VB; 22RH4- 2B 230V AC VB
Interlocks:
Manual Operation of Associated Containment Sump Vlv (SJ44) must be fully closed to open RH4 (so you don't Pp RWST/RCS to the Containment Sump)
Unit 2 has "Semi-Auto Swap Over" allows SJ44 to open and RH4 auto close.
permissives:
- must ensure adequate Containment Sump Level
- Need 2/4 lvl transmitters in RWST to read Lo-Lo Alarm
- need SI signal from SEC/SSPS
- transfer is "fast acting valves", both valves are only open for a short time
- interlocks in place to prevent loss of suction to RHR Pps
|
|
|
Term
MOVs- SJ44 Containment Sump Isolation Valves
Specs and Interlocks |
|
Definition
Normally Closed
45 Aux Bldg
35 sec stroke time
Power 21SJ44- A 230V VB, 22SJ44 B 230 V VB
Interlocks:
Mannually Open- associated RH4 must be fully closed prevents mannually draining RWST to Containment
Semi-Auto Swap- SI and 2/4 RWST Lo-Lo Level Alarm, auto opens if armed, associated RH4 closes when SJ44 is full open
Spurious opening at Power is prevented by lock out on RP 4 and by "not arming the valves"
|
|
|
Term
MOVs- SJ69 RWST to RHR Suction Valves Specs and Interlocks |
|
Definition
Normally Open
55 Aux Bldg
25 sec stroke time
Power C 230V VB
Interlocks:
Power Lock out switch on RP 4
This valve could inop RHR because its a single valve feeding both trains of RHR from the RWST |
|
|
Term
MOVs- RH29 Minimum Flow Valve Specs and Interlocks |
|
Definition
45 Aux Bldg
30 sec Stroke time
Power 21RH29-A 230V VB; 22RH29- B 230V VB
Auto Operation:
Open <500 gpm with Pp breaker Closed
Closes > 1150 gpm with Pp Breaker Open
Valves must be in auto for RHR to be operable, must work as designed
Valves don't Cycle due to 600 gpm Deadband
If flow is < 500 gpm vlv will be open and stay open until it reaches > 1150 gpm.
Interlocks- NONE
When RHR is in recirc there is no cooling to the Pp, therefore the Pps can heat up after a short period of time.
|
|
|
Term
With RHR Pp off (brkr open) what is the position of the 22RH29? |
|
Definition
Closed.
Valve closes >1150gpm, with Pp breaker open |
|
|
Term
With RHR Pp in service, reading 600 gpm flow, should the RH29's be open? |
|
Definition
No, because flow is >500 gpm, valve will open when flow is <500 gpm. |
|
|
Term
RH19s RHR Cross Connection Valves |
|
Definition
Normal Open
45 Aux Bldg
10 Sec Stroke Time
Both valves must remain open to meet TS 3.5.2 for injection, ensures that either Pp can inject into all 4 loops/cold legs
Valves must be closed in Recirc Phase, to separate trains and supply different loads (SI Pp, CH Pps, CS Pp)
Power supply 21RH19, A 230V VB, 22RH19 B 230V VB
Interlocks: None |
|
|
Term
21SJ 45 Specs and Interlocks |
|
Definition
Normally Closed
84 Aux Bldg
10 sec stroke time
Manually opened when in recirc phase
Power Supply 21SJ44 A 230V VB
Interlocks:
- 21SJ44 must be full open to align to containment recirc
- RH1 or RH2 must be fully closed, so you don't align to normal SD cooling path
- 2SJ67 or 2SJ68 SI Pp Recirc to RWST must be fully closed. So you don't align the containment sump to the RWST
|
|
|
Term
22SJ45 RHR to SI/CH Pp Suction |
|
Definition
Normally Closed
84 Aux Bldg
10 sec stroke time
Power Supply 22SJ44 B 230V VB
Interlocks:
- 22SJ44 must be full open to align to containment recirc
- RH1 or RH2 must be fully closed, so you don't align to normal SD cooling path
- 2SJ67 or 2SJ68 SI Pp Recirc to RWST must be fully closed. So you don't align the containment sump to the RWST
|
|
|
Term
21/22SJ113's SI Pp suction cross connection valves |
|
Definition
normally closed, 10 sec stroke time
84 aux, Power 21SJ113 A 230V VB, 22SJ113 B 230V VB
Interlocks: None
Only need one valve to open, as they run parallel |
|
|
Term
SJ49's RHR to Cold Leg Injection Valves |
|
Definition
Normally open, 78 mech pen, 10 sec stroke time
21SJ49 supplies 21 and 23 Cold Legs
22SJ40 Supplies 22 and 24 Cold Legs
Power supply 21SJ49 A 230V VB, 22SJ49 B 230V VB
Interlocks:
Power Lock out switches in RP4, prevents inadvertent closure, must be used to close valves. |
|
|
Term
RH26 Hot Leg Injection Valve |
|
Definition
Normally Closed
78 Containment
Not normal flow path for EOPs, used in AB LOCA if hot leg injection is required and SI Pp is not available.
Power is C 230V VB
Interlocks:
Power Lock out switch on RP4, prevent inadvertent opening , also has a key interlock prior to opening the valve |
|
|
Term
CS 36 RHR to Containment Spray |
|
Definition
Normally Closed
78 Inner Pen
10 sec stroke time
used to supply CS to header when RWST is empty, and on Recirc
Power Supply 21CS36 A 230V VB, 22CS36 B 230V VB
Interlocks:
Associated with SJ44 must be open
RH1/2 must be closed
2500 gpm for full CS flow |
|
|
Term
RH18s RHR HX Discharge Valves |
|
Definition
Normally open, failed open, no CA to valve
Failure Modes
FAI, loss of air, FO on loss of control power
controls through respective HX
used in conjunction with RH20 HX bypass to control cooldown rate while maintaining RHR flow within operating band
While at power, if you restore CA to this valve you inop RHR. |
|
|
Term
|
Definition
|
|