SW Nuclear and Turbine Header Objectives Study Guide
19
Other
Professional
07/21/2013

Additional Other Flashcards

 


 

Cards

Term

SW Nuclear Header

 

Purpose

Definition

Ultimate Heat Sink for heat loads in the Aux Building and Containment.

1. Operation during: Startup, normal operation, shutdown, and accident conditions

2. Provide supply under all credible seismic, flood, storm and drought conditions

3. Proper operation directly supports nuclear safety

 

Term

SW Nuclear Header

 

Design Basis

Definition

1. Designed to transfer heat loads from the reactor safeguards and nuclear auxiliary equipment to the ultimate heat sink during Normal and Accident conditions.

2. Safeguard system consists of 2 independent, full sized headers, each supplied by a group of 3 pumps for each unit.

3. 2 operable loops are required to meet Tech Specs

Term
What system does SW provide an emergency backup source?
Definition
AUX Feed Water
Term
Which CFCU can be fed from either Nuclear header?
Definition
23CFCU can be fed from either header via the 21SW53 or 22SW53 check valves.
Term

Name the CFCUs fed from 21 Nuclear header...

 

Name the CFCUs fed from 22 Nuclear header...

Definition

21 NH= 21CFCU thru 21SW54

21 NH= 22CFCU thru 22SW54

22 NH= 24CFCU thru 24SW54

22 NH= 25CFCU thru 25SW54

21NH or 22NH= 23CFCU thru 23SW54

Term

EDGs are cooled by SW through which valves and what are their modes of operation?

 

What nuclear header supplies the EDGs?

Definition

SW39 Inlet and SW42 Outlet

 

SW39 opens upon EDG start and closes on Stop.

SW42 DP control valve maintains 190" or 750gpm

 

Valves designed to Fail open upon loss of air.

 

EDGs can be fed from either 21SW or 22SW Header

Term
Name the SW inlet and outlet isolation valves for the CFCUs and their modes of operation.
Definition

SW58 Inlet

 SW72 Outlet

Designed to Fail open upon loss of control air

Designed to Fail close upon loss of 125VDC

Term
CFCU Modes of operation include...
Definition

Normal operation: 2-3 CFCUs I/S Fan in Hi Speed

 

Accident operation: 5 CFCUs I/S Fan in Low speed

 

SW fixed flow of 1465gpm

 

 

Term
During mode III Accident LOCA + LOOP, What is the expected operation of the CFCUs?
Definition
Loads stripped from their buses and reloaded within 33-37 Seconds.
Term

SW Accumulator

Purpose and operation

Definition

2 pressurized SW Accumulators per unit.

Designed to deliver 30gpm at 253' of head

Pressurized (144-150 psi) with nitrogen (N2) to force water through the CFCUs during an UV actuation from at least 1 out of 2 relays on 2 4KV buses.

Each accumulator has its own fill pump

capacity of 15,000g, filled with 10,000g of SW

 

Term
State the normal SW line up for the 21, 22, and 23 chillers.
Definition

21 and 22 are normally feed from SW22 NH

23 chiller and #2 ECAC are normally fed from SW21 NH

Term
Which system place the largest load on the SW Nuclear headers?
Definition

21/22 Component Cooling Heat Exchangers

 

SW Flow of 10,000 gpm Max

 

Design Pressure/Temp: 150psi/200F

Term
TGA SW Header...
Definition

Fed from 2SW26 to 2ST1

 

2ST1 feeds: 21/22 TAC HX

                  21/22 MTLO Coolers

                  21 A/B SGFP LO Coolers

                  22 A/B SGFP LO Coolers

                  SACs

Term
2ST1 Purpose
Definition
Modulates to reduce SW pressure to 80 PSI prior to entering the turbine area coolers and heat exchangers.
Term
2ST901 Purpose
Definition
Located downstream of the TGA Cooler temp control valves, used to maintain 50 PSI back pressure on the discharge header
Term
2ST25 Purpose
Definition

Offers over pressure protection to the MTLO and Turbine Oil Coolers.

 

Opens @ 125 PSI

Term
What system is the largest load on the TGA Header?
Definition
21/22 TAC HX @ 10,000 gpm
Term
2ST51 Purpose
Definition

ST Header Bypass Valve

Protects the TAC HX from over pressure

 

Opens @130 PSI